Winter Special Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

C_TS413_2021 Sample Questions Answers

Questions 4

During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question.

Options:

A.

Storage location

B.

Maintenance work center

C.

Business partner

D.

Maintenance planner group

Buy Now
Questions 5

How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question.

Options:

A.

By assigning a PFCG role with an SAP Fiori catalog

B.

By assigning a PFCG role with an SAP Fiori tile group

C.

By assigning a portal role with an SAP Fiori catalog

D.

By assigning the tiles directly

Buy Now
Questions 6

Which material type is the best choice if you only want to create a structure element within the BOM?

Options:

A.

Spare part (ERSA)

B.

Maintenance assembly (IBAU)

C.

Non-valuated material (UNBW)

D.

Operating supplies (HIBE)

Buy Now
Questions 7

The planner adds non-stock material in a released maintenance order. Which of the following statements regarding the purchasing process are correct? Note: There are 3 correct answers to this question.

Options:

A.

The maintenance order can be set to TECO before the invoice is created.

B.

A purchase order is created automatically as soon as the order is saved.

C.

A purchase requisition can be created automatically as soon asthe the order is saved.

D.

A goods receipt can be posted after the maintenance order is technically completed

E.

A goods receipt can ONLY be posted for a maintenance order with status REL.

Buy Now
Questions 8

You cancel the technical completion of a work order. What are theeffects? Note: There are 2 correct answers to this question.

Options:

A.

Open purchase orders are recompiled.

B.

Open reservations are recompiled.

C.

Referenced notifications are put In Process again.

D.

Open purchase requisitions are recompiled

Buy Now
Questions 9

You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized?

Options:

A.

Invoice

B.

Service entry sheet

C.

Purchase order

D.

Goods movement

Buy Now
Questions 10

Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question.

Options:

A.

Configuration

B.

Manufacturer data

C.

Serial data

D.

Warranty

Buy Now
Questions 11

The maintenance technician wants to document the finished work steps for a technical object in a notification. Which catalog-based option in the notification can be used?

Options:

A.

An activity in the notification header

B.

A text in the subject long text screen

C.

A task in the notification item

D.

An entry in the object list

Buy Now
Questions 12

What does a virtual data model provides

Options:

A.

A copy of the database optimized for analytical purpose

B.

Ready to use business reports

C.

consumption ready views of data

D.

Reporting tools for users

Buy Now
Questions 13

Which activities can the technician perform with the Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to thisquestion.

Options:

A.

Release. Print

B.

Put in Process.

Schedule

C.

Release. Start Work

D.

Complete. Close Report

Buy Now
Questions 14

You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.

Options:

A.

Assign a piece of equipment with an allocated measuring point to a task list operation.

B.

Assign an inspection lot to the task list header.

C.

Assign a measuring point as a production resources/tools(PRT) to a task list operation.

D.

Assign an inspection document as PRT to the task list operation.

Buy Now
Questions 15

How does a performance-based maintenance plan calculate the interval between start date and planned date?

Options:

A.

Cycle length divided by annual performance

B.

Cycle length divided by monthly performance

C.

Cycle length divided by ((scheduling period) x (cycle modification factor))

D.

Cycle length divided by (annual performance / 365)

Buy Now
Questions 16

You want to display vehicle-specific data for a piece of equipment. How do you proceed?

Options:

A.

Assign a view profile to an equipment category for fleet equipment.

B.

Assign a view profile to the combination of fleet object type and equipment category.

C.

Define the field selection for the vehicle equipment master data.

D.

Assign a view profile to the combination of fleet object type and usage type.

Buy Now
Questions 17

What are the prerequisites to serialize a piece of equipment? Note:There are 3 correct answers to this question.

Options:

A.

Assign a serial number profile to the related material master.

B.

Assign a serial number profile to the equipment category.

C.

Add a serialized material to the equipment serial data view.

D.

Maintain a serial number for an existing equipment master.

E.

Add a serialized material to the construction type field of the equipment master.

Buy Now
Questions 18

Which of the following statements about orders with operation account assignment (OAA) are correct? Note: There are 3 correct answers to this question.

Options:

A.

The settlement rule is maintained on header level.

B.

Purchase requisitions have the operation as account assignment.

C.

A technical object must be assigned to an order operation.

D.

Costs are only stored for the operation object.

E.

Overall costs are dynamically summed up on header level.

Buy Now
Questions 19

Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.

Options:

A.

Cancel dispatched maintenance order operations.

B.

Schedule and dispatch maintenance operations by shifts.

C.

Monitor maintenance order operations due in the next 4 weeks.

D.

Print job papers from a maintenance order.

Buy Now
Questions 20

You require stock material to carry out maintenance tasks. Whichof the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct answers to this question.

Options:

A.

Material can be assigned at order header level.

B.

A control key for internal workforce is required when assigning stock material to an order operation.

C.

Material can be assigned at order operation level.

D.

The pick list for materials can be printed before order release.

E.

A goods receipt can be entered for a technically completed maintenance order.

Buy Now
Questions 21

Which of the following statements about breakdown maintenanceare correct? Note: There are 3 correct answers to this question.

Options:

A.

More than one operation must always be maintained in the maintenance order.

B.

Notifications are used for documentation of technical findingsand activities performed.

C.

Maintenance orders can be created as immediate orders without any planning.

D.

Orders always need to be combined with notifications

E.

Orders and notifications can be utilized in combination

Buy Now
Questions 22

You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?

Options:

A.

Historical Orders list

B.

Structure Display

C.

Location Analysis list

D.

Usage list

Buy Now
Questions 23

You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question.

Options:

A.

Shift factors

B.

Start counter reading

C.

Estimated annual performance

D.

Scheduling period

Buy Now
Questions 24

Which statement is correct when planning maintenance work thatis to be carried out by an external company?

Options:

A.

In the control key assigned to the order operation, the "Service" indicator must always be activated.

B.

A service master record must always be assigned to the external order operation.

C.

If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.

D.

If you assign a control key for an external order operation, theactual values must always be entered as a goods receipt in the system.

Buy Now
Questions 25

What do you need to configure to enable entries in the action log ofan equipment?

Options:

A.

Select the time segment check box for the equipment category.

B.

Define an additional business view for the equipment category.

C.

Define the corresponding history-related field for the equipment reference category.

D.

Activate the change documents for the equipment category.

Buy Now
Questions 26

You create a revision for a maintenance event builder (MEB) scenario. Which of the following statements are correct? Note: Thereare 2 correct answers to this question.

Options:

A.

You can assign a network to a revision.

B.

You must assign maintenance notifications to the revision.

C.

You must use hierarchical task lists for the MEB scenario.

D.

You can assign a hierarchical task list to the revision.

Buy Now
Exam Code: C_TS413_2021
Exam Name: SAP Certified Application Associate - SAP S/4HANA Asset Management
Last Update: Dec 3, 2024
Questions: 87
$66  $164.99
$50  $124.99
$42  $104.99
buy now C_TS413_2021