Questions 4

Which of the following risk assessment methods provides an information security risk assessment methodology and involves three phases build asset-based threat profiles, identify infrastructure vulnerabilities, and develop security strategy and plans?

Options:

A.

OCTAVE-S

B.

MEHARI

C.

TRA

Buy Now
Questions 5

Scenario 4: In 2017, seeing that millions of people turned to online shopping, Ed and James Cordon founded the online marketplace for footwear called Poshoe. In the past, purchasing pre-owned designer shoes online was not a pleasant experience because of unattractive pictures and an inability to ascertain the products’ authenticity. However, after Poshoe’s establishment, each product was well advertisedand certified as authentic before being offered to clients. This increased the customers’ confidence and trust in Poshoe’s products and services. Poshoe has approximately four million users and its mission is to dominate the second-hand sneaker market and become a multi-billion dollar company.

Due to the significant increase of daily online buyers, Poshoe’s top management decided to adopt a big data analytics tool that could help the company effectively handle, store, and analyze data. Before initiating the implementation process, they decided to conduct a risk assessment. Initially, the company identified its assets, threats, and vulnerabilities associated with its information systems. In terms of assets, the company identified the information that was vital to the achievement of the organization’s mission and objectives. During this phase, the company also detected a rootkit in their software, through which an attacker could remotely access Poshoe’s systems and acquire sensitive data.

The company discovered that the rootkit had been installed by an attacker who had gained administrator access. As a result, the attacker was able to obtain the customers’ personal data after they purchased a product from Poshoe. Luckily, the company was able to execute some scans from the target device and gain greater visibility into their software’s settings in order to identify the vulnerability of the system.

The company initially used the qualitative risk analysis technique to assess the consequences and the likelihood and to determine the level of risk. The company defined the likelihood of risk as “a few times in two years with the probability of 1 to 3 times per year.” Later, it was decided that they would use a quantitative risk analysis methodology since it would provide additional information on this major risk. Lastly, the top management decided to treat the risk immediately as it could expose the company to other issues. In addition, it was communicated to their employees that they should update, secure, and back up Poshoe’s software in order to protect customers’ personal information and prevent unauthorized access from attackers.

According to scenario 4, Poshoe has identified its assets, vulnerabilities, and threats associated with its information systems. What does the company need in order to start identifying its existing controls?

Options:

A.

The risk treatment implementation plan and documentation of controls

B.

A list of all existing and planned controls

C.

A list of incident scenarios with their consequences

Buy Now
Questions 6

Scenario 2: Travivve is a travel agency that operates in more than 100 countries. Headquartered in San Francisco, the US, the agency is known for its personalized vacation packages and travel services. Travivve aims to deliver reliable services that meet its clients’ needs. Considering the impact of information security in its reputation, Travivve decided to implement an information security management system (ISMS) based on ISO/IEC 27001. In addition, they decided to establish and implement an information security risk management program. Based on the priority of specific departments in Travivve, the top management decided to initially apply the risk management process only in the Sales Management Department. The process would be applicable for other departments only when introducing new technology.

Travivve’s top management wanted to make sure that the risk management program is established based on the industry best practices. Therefore, they created a team of three members that would be responsible for establishing and implementing it. One of the team members was Travivve’s risk manager who was responsible for supervising the team and planning all risk management activities. In addition,the risk manager was responsible for monitoring the program and reporting the monitoring results to the top management.

Initially, the team decided to analyze the internal and external context of Travivve. As part of the process of understanding the organization and its context, the team identified key processes and activities. Then, the team identified the interested parties and their basic requirements and determined the status of compliance with these requirements. In addition, the team identified all the reference documents that applied to the defined scope of the risk management process, which mainly included the Annex A of ISO/IEC 27001 and the internal security rules established by Travivve. Lastly, the team analyzed both reference documents and justified a few noncompliances with those requirements.

The risk manager selected the information security risk management method which was aligned with other approaches used by the company to manage other risks. The team also communicated the risk management process to all interested parties through previously established communication mechanisms. In addition, they made sure to inform all interested parties about their roles and responsibilities regarding risk management. Travivve also decided to involve interested parties in its risk management activities since, according to the top management, this process required their active participation.

Lastly, Travivve’s risk management team decided to conduct the initial information security risk assessment process. As such, the team established the criteria for performing the information security risk assessment which included the consequence criteria and likelihood criteria.

Based on the scenario above, answer the following question:

Travivve decided to initially apply the risk management process only in the Sales Management Department. Is this acceptable?

Options:

A.

No, the risk management process must be applied in all organizational levels

B.

Yes, the risk management process may be applied to only a subset of departments in an organization

C.

Yes, the risk management process must be applied to only those departments that handle customers' personal information in an organization

Buy Now
Questions 7

Scenario 8: Biotide is a pharmaceutical company that produces medication for treating different kinds of diseases. The company was founded in 1997, and since then it has contributed in solving some of the most challenging healthcare issues.

As a pharmaceutical company, Biotide operates in an environment associated with complex risks. As such, the company focuses on risk management strategies that ensure the effective management of risks to develop high-quality medication. With the large amount of sensitive information generated from the company, managing information security risks is certainly an important part of the overall risk management process. Biotide utilizes a publicly available methodology for conducting risk assessment related to information assets. This methodology helps Biotide to perform risk assessment by taking into account its objectives and mission. Following this method, the risk management process is organized into four activity areas, each of them involving a set of activities, as provided below.

1. Activity area 1: The organization determines the criteria against which the effects of a risk occurring can be evaluated. In addition, the impacts of risks are also defined.

2. Activity area 2: The purpose of the second activity area is to create information asset profiles. The organization identifies critical information assets, their owners, as well as the security requirements for those assets. After determining the security requirements, the organization prioritizes them. In addition, the organization identifies the systems that store, transmit, or process information.

3. Activity area 3: The organization identifies the areas of concern which initiates the risk identification process. In addition, the organization analyzes and determines the probability of the occurrence of possible threat scenarios.

4. Activity area 4: The organization identifies and evaluates the risks. In addition, the criteria specified in activity area 1 is reviewed and the consequences of the areas of concerns are evaluated. Lastly, the level of identified risks is determined.

The table below provides an example of how Biotide assesses the risks related to its information assets following this methodology:

According to the risk assessment methodology used by Biotide, what else should be performed during activity area 4? Refer to scenario 8.

Options:

A.

Create a strategic and operational plan

B.

Select a mitigation strategy for the identified risk profiles

C.

Monitor security controls for ensuring they are appropriate for new threats

Buy Now
Questions 8

Scenario 6: Productscape is a market research company headquartered in Brussels, Belgium. It helps organizations understand the needs and expectations of their customers and identify new business opportunities. Productscape’s teams have extensive experience in marketing and business strategy and work with some of the best-known organizations in Europe. The industry in which Productscape operates requires effective risk management. Considering that Productscape has access to clients’ confidential information, it is responsible for ensuring its security. As such, the company conducts regular risk assessments. The top management appointed Alex as the risk manager, who is responsible for monitoring the risk management process and treating information security risks.

The last risk assessment conducted was focused on information assets. The purpose of this risk assessment was to identify information security risks, understand their level, and take appropriate action to treat them in order to ensure the security of their systems. Alex established a team of three members to perform the risk assessment activities. Each team member was responsible for specific departments included in the risk assessment scope. The risk assessment provided valuable information to identify, understand, and mitigate the risks that Productscape faces.

Initially, the team identified potential risks based on the risk identification results. Prior to analyzing the identified risks, the risk acceptance criteria were established. The criteria for accepting the risks were determined based on Productscape’s objectives, operations, and technology. The team created various risk scenarios and determined the likelihood of occurrence as “low,” “medium,” or “high.” They decided that if the likelihood of occurrence for a risk scenario is determined as “low,” no further action would be taken. On the other hand, if the likelihood of occurrence for a risk scenario is determined as “high” or “medium,” additional controls will be implemented. Some information security risk scenarios defined by Productscape’s team were as follows:

1. A cyber attacker exploits a security misconfiguration vulnerability of Productscape’s website to launch an attack, which, in turn, could make the website unavailable to users.

2. A cyber attacker gains access to confidential information of clients and may threaten to make the information publicly available unless a ransom is paid.

3. An internal employee clicks on a link embedded in an email that redirects them to an unsecured website, installing a malware on the device.

The likelihood of occurrence for the first risk scenario was determined as “medium.” One of the main reasons that such a risk could occur was the usage of default accounts and password. Attackers could exploit this vulnerability and launch a brute-force attack. Therefore, Productscape decided to start using an automated “build and deploy” process which would test the software on deploy and minimize thelikelihood of such an incident from happening. However, the team made it clear that the implementation of this process would not eliminate the risk completely and that there was still a low possibility for this risk to occur. Productscape documented the remaining risk and decided to monitor it for changes.

The likelihood of occurrence for the second risk scenario was determined as “medium.” Productscape decided to contract an IT company that would provide technical assistance and monitor the company’s systems and networks in order to prevent such incidents from happening.

The likelihood of occurrence for the third risk scenario was determined as “high.” Thus, Productscape decided to include phishing as a topic on their information security training sessions. In addition, Alex reviewed the controls of Annex A of ISO/IEC 27001 in order to determine the necessary controls for treating this risk. Alex decided to implement control A.8.23 Web filtering which would help the company to reduce the risk of accessing unsecure websites. Although security controls were implemented to treat the risk, the level of the residual risk still did not meet the risk acceptance criteria defined in the beginning of the risk assessment process. Since the cost of implementing additional controls was too high for the company, Productscape decided to accept the residual risk. Therefore, risk owners were assigned the responsibility of managing the residual risk.

Based on the scenario above, answer the following question:

Which risk treatment option was used for the first risk scenario?

Options:

A.

Risk modification

B.

Risk avoidance

C.

Risk sharing

Buy Now
Questions 9

Scenario 8: Biotide is a pharmaceutical company that produces medication for treating different kinds of diseases. The company was founded in 1997, and since then it has contributed in solving some of the most challenging healthcare issues.

As a pharmaceutical company, Biotide operates in an environment associated with complex risks. As such, the company focuses on risk management strategies that ensure the effective management of risks to develop high-quality medication. With the large amount of sensitive information generated from the company, managing information security risks is certainly an important part of the overall risk management process. Biotide utilizes a publicly available methodology for conducting risk assessment related to information assets. This methodology helps Biotide to perform risk assessment by taking into account its objectives and mission. Following this method, the risk management process is organized into four activity areas, each of them involving a set of activities, as provided below.

1. Activity area 1: The organization determines the criteria against which the effects of a risk occurring can be evaluated. In addition, the impacts of risks are also defined.

2. Activity area 2: The purpose of the second activity area is to create information asset profiles. The organization identifies critical information assets, their owners, as well as the security requirements for those assets. After determining the security requirements, the organization prioritizes them. In addition, the organization identifies the systems that store, transmit, or process information.

3. Activity area 3: The organization identifies the areas of concern which initiates the risk identification process. In addition, the organization analyzes and determines the probability of the occurrence of possible threat scenarios.

4. Activity area 4: The organization identifies and evaluates the risks. In addition, the criteria specified in activity area 1 is reviewed and the consequences of the areas of concerns are evaluated. Lastly, the level of identified risks is determined.

The table below provides an example of how Biotide assesses the risks related to its information assets following this methodology:

Based on scenario 8, how should Biotide use the criteria defined in the activity area 1?

Options:

A.

To evaluate the potential impact of the risk on Biotide's objectives

B.

To identify the assets on which information is stored

C.

To determine the probability of threat scenarios

Buy Now
Questions 10

Scenario 7: Adstry is a business growth agency that specializes in digital marketing strategies. Adstry helps organizations redefine the relationships with their customers through innovative solutions. Adstry is headquartered in San Francisco and recently opened two new offices in New York. The structure of the company is organized into teams which are led by project managers. The project manager has the full power in any decision related to projects. The team members, on the other hand, report the project’s progress to project managers.

Considering that data breaches and ad fraud are common threats in the current business environment, managing risks is essential for Adstry. When planning new projects, each project manager is responsible for ensuring that risks related to a particular project have been identified, assessed, and mitigated. This means that project managers have also the role of the risk manager in Adstry. Taking into account that Adstry heavily relies on technology to complete their projects, their risk assessment certainly involves identification of risks associated with the use of information technology. At the earliest stages of each project, the project manager communicates the risk assessment results to its team members.

Adstry uses a risk management software which helps the project team to detect new potential risks during each phase of the project. This way, team members are informed in a timely manner for the new potential risks and are able to respond to them accordingly. The project managers are responsible for ensuring that the information provided to the team members is communicated using an appropriate language so it can be understood by all of them.

In addition, the project manager may include external interested parties affected by the project in the risk communication. If the project manager decides to include interested parties, the risk communication is thoroughly prepared. The project manager firstly identifies the interested parties that should be informed and takes into account their concerns and possible conflicts that may arise due to risk communication. The risks are communicated to the identified interested parties while taking into consideration the confidentiality of Adstry’s information and determining the level of detail that should be included in the risk communication. The project managers use the same risk management software for risk communication with external interested parties since it provides a consistent view of risks. For each project, the project manager arranges regular meetings with relevant interested parties of the project, they discuss the detected risks, their prioritization, and determine appropriate treatment solutions. The information taken from the risk management software and the results of these meetings are documented and are used for decision-making processes. In addition, the company uses a computerized documented information management system for the acquisition, classification, storage, and archiving of its documents.

Based on scenario 7, project managers communicate risks to external interested parties, taking into account the information confidentiality. Which principle of efficient communication strategy do project managers follow?

Options:

A.

Credibility

B.

Responsiveness

C.

Transparency

Buy Now
Questions 11

Scenario 5: Detika is a private cardiology clinic in Pennsylvania, the US. Detika has one of the most advanced healthcare systems for treating heart diseases. The clinic uses sophisticated apparatus that detects heart diseases in early stages. Since 2010, medical information of Detika’s patients is stored on the organization’s digital systems. Electronic health records (EHR), among others, include patients’ diagnosis, treatment plan, and laboratory results.

Storing and accessing patient and other medical data digitally was a huge and a risky step for Detika. Considering the sensitivity of information stored in their systems, Detika conducts regular riskassessments to ensure that all information security risks are identified and managed. Last month, Detika conducted a risk assessment which was focused on the EHR system. During risk identification, the IT team found out that some employees were not updating the operating systems regularly. This could cause major problems such as a data breach or loss of software compatibility. In addition, the IT team tested the software and detected a flaw in one of the software modules used. Both issues were reported to the top management and they decided to implement appropriate controls for treating the identified risks. They decided to organize training sessions for all employees in order to make them aware of the importance of the system updates. In addition, the manager of the IT Department was appointed as the person responsible for ensuring that the software is regularly tested.

Another risk identified during the risk assessment was the risk of a potential ransomware attack. This risk was defined as low because all their data was backed up daily. The IT team decided to accept the actual risk of ransomware attacks and concluded that additional measures were not required. This decision was documented in the risk treatment plan and communicated to the risk owner. The risk owner approved the risk treatment plan and documented the risk assessment results.

Following that, Detika initiated the implementation of new controls. In addition, one of the employees of the IT Department was assigned the responsibility for monitoring the implementation process and ensure the effectiveness of the security controls. The IT team, on the other hand, was responsible for allocating the resources needed to effectively implement the new controls.

Based on scenario 5, the decision to accept the risk of a potential ransomware attack was approved by the risk owner. Is this acceptable?

Options:

A.

No, all interested parties should approve the risk treatment plan

B.

No, the risk treatment plan should be approved by the top management and implemented by risk owners

C.

Yes, the risk treatment plan should be approved bythe risk owners

Buy Now
Questions 12

Scenario 6: Productscape is a market research company headquartered in Brussels, Belgium. It helps organizations understand the needs and expectations of their customers and identify new business opportunities. Productscape’s teams have extensive experience in marketing and business strategy and work with some of the best-known organizations in Europe. The industry in which Productscape operates requires effective risk management. Considering that Productscape has access to clients’ confidential information, it is responsible for ensuring its security. As such, the company conducts regular risk assessments. The top management appointed Alex as the risk manager, who is responsible for monitoring the risk management process and treating information security risks.

The last risk assessment conducted was focused on information assets. The purpose of this risk assessment was to identify information security risks, understand their level, and take appropriate action to treat them in order to ensure the security of their systems. Alex established a team of three members to perform the risk assessment activities. Each team member was responsible for specific departments included in the risk assessment scope. The risk assessment provided valuable information to identify, understand, and mitigate the risks that Productscape faces.

Initially, the team identified potential risks based on the risk identification results. Prior to analyzing the identified risks, the risk acceptance criteria were established. The criteria for accepting the risks were determined based on Productscape’s objectives, operations, and technology. The team created various risk scenarios and determined the likelihood of occurrence as “low,” “medium,” or “high.” They decided that if the likelihood of occurrence for a risk scenario is determined as “low,” no further action would be taken. On the other hand, if the likelihood of occurrence for a risk scenario is determined as “high” or “medium,” additional controls will be implemented. Some information security risk scenarios defined by Productscape’s team were as follows:

1. A cyber attacker exploits a security misconfiguration vulnerability of Productscape’s website to launch an attack, which, in turn, could make the website unavailable to users.

2. A cyber attacker gains access to confidential information of clients and may threaten to make the information publicly available unless a ransom is paid.

3. An internal employee clicks on a link embedded in an email that redirects them to an unsecured website, installing a malware on the device.

The likelihood of occurrence for the first risk scenario was determined as “medium.” One of the main reasons that such a risk could occur was the usage of default accounts and password. Attackers could exploit this vulnerability and launch a brute-force attack. Therefore, Productscape decided to start using an automated “build and deploy” process which would test the software on deploy and minimize the likelihood of such an incident from happening. However, the team made it clear that the implementation of this process would not eliminate the risk completely and that there was still a lowpossibility for this risk to occur. Productscape documented the remaining risk and decided to monitor it for changes.

The likelihood of occurrence for the second risk scenario was determined as “medium.” Productscape decided to contract an IT company that would provide technical assistance and monitor the company’s systems and networks in order to prevent such incidents from happening.

The likelihood of occurrence for the third risk scenario was determined as “high.” Thus, Productscape decided to include phishing as a topic on their information security training sessions. In addition, Alex reviewed the controls of Annex A of ISO/IEC 27001 in order to determine the necessary controls for treating this risk. Alex decided to implement control A.8.23 Web filtering which would help the company to reduce the risk of accessing unsecure websites. Although security controls were implemented to treat the risk, the level of the residual risk still did not meet the risk acceptance criteria defined in the beginning of the risk assessment process. Since the cost of implementing additional controls was too high for the company, Productscape decided to accept the residual risk. Therefore, risk owners were assigned the responsibility of managing the residual risk.

Based on scenario 6, Productscape decided to accept the residual risk and risk owners were assigned the responsibility of managing this risk.

Based on the guidelines of ISO/IEC 27005, is this acceptable?

Options:

A.

Yes, risk owners must be aware of the residual risk and accept the responsibility for managing it

B.

No, risk approvers are responsible for managing the residual risk after accepting it

C.

No, the top management should manage the residual risk

Buy Now
Questions 13

Scenario 1

The risk assessment process was led by Henry, Bontton’s risk manager. The first step that Henry took was identifying the company’s assets. Afterward, Henry created various potential incident scenarios. One of the main concerns regarding the use of the application was the possibility of being targeted by cyber attackers, as a great number of organizations were experiencing cyberattacks during that time. After analyzing the identified risks, Henry evaluated them and concluded that new controls must be implemented if the company wants to use the application. Among others, he stated that training should be provided to personnel regarding the use of the application and that awareness sessions should be conducted regarding the importance of protecting customers’ personal data.

Lastly, Henry communicated the risk assessment results to the top management. They decided that the application will be used only after treating the identified risks.

Based on the scenario above, answer the following question:

Bontton established a risk management process based on ISO/IEC 27005, to systematically manage information security threats. Is this a good practice?

Options:

A.

Yes, ISO/IEC 27005 provides guidelines for information security risk management that enable organizations to systematically manage information security threats

B.

Yes, ISO/IEC 27005 provides guidelines to systematically manage all types of threats that organizations may face

C.

No, ISO/IEC 27005 cannot be used to manage information security threats in the food sector

Buy Now
Questions 14

Which of the following statements best defines information security risk?

Options:

A.

The potential that threats will exploit vulnerabilities of an information asset and cause harm to an organization

B.

Weakness of an asset or control that can be exploited by one or a group of threats

C.

Potential cause of an unwanted incident related to information security that can cause harm to an organization

Buy Now
Questions 15

Which activity below is NOT included in the information security risk assessment process?

Options:

A.

Determining the risk identification approach

B.

Prioritizing risks for risk treatment

C.

Selecting information security risk treatment options

Buy Now
Questions 16

Scenario 2: Travivve is a travel agency that operates in more than 100 countries. Headquartered in San Francisco, the US, the agency is known for its personalized vacation packages and travel services. Travivve aims to deliver reliable services that meet its clients’ needs. Considering the impact of information security in its reputation, Travivve decided to implement an information security management system (ISMS) based on ISO/IEC 27001. In addition, they decided to establish and implement an information security risk management program. Based on the priority of specific departments in Travivve, the top management decided to initially apply the risk management process only in the Sales Management Department. The process would be applicable for other departments only when introducing new technology.

Travivve’s top management wanted to make sure that the risk management program is established based on the industry best practices. Therefore, they created a team of three members that would be responsible for establishing and implementing it. One of the team members was Travivve’s risk manager who was responsible for supervising the team and planning all risk management activities. In addition, the risk manager was responsible for monitoring the program and reporting the monitoring results to the top management.

Initially, the team decided to analyze the internal and external context of Travivve. As part of the process of understanding the organization and its context, the team identified key processes and activities. Then, the team identified the interested parties and their basic requirements and determined the status of compliance with these requirements. In addition, the team identified all the reference documents that applied to the defined scope of the risk management process, which mainly included the Annex A of ISO/IEC 27001 and the internal security rules established by Travivve. Lastly, the team analyzed both reference documents and justified a few noncompliances with those requirements.

The risk manager selected the information security risk management method which was aligned with other approaches used by the company to manage other risks. The team also communicated the risk management process to all interested parties through previously established communication mechanisms. In addition, they made sure to inform all interested parties about their roles and responsibilities regarding risk management. Travivve also decided to involve interested parties in its risk management activities since, according to the top management, this process required their active participation.

Lastly, Travivve’s risk management team decided to conduct the initial information security risk assessment process. As such, the team established the criteria for performing the information security risk assessment which included the consequence criteria and likelihood criteria.

Did the risk management team establish all the criteria required to perform the information security risk assessment? Refer to scenario 2.

Options:

A.

No, the risk management team should also establish the criteria for determining the level of risk

B.

No, the risk management team should also establish the criteria for treating the identified risks

C.

Yes. the risk management team established all the criteria that are necessary to perform an information security risk assessment

Buy Now
Questions 17

According to ISO/IEC 27005, what is the input when selecting information security risk treatment options?

Options:

A.

A risk treatment plan and residual risks subject to the acceptance decision

B.

A list of prioritized risks with event or risk scenarios that lead to those risks

C.

A list of risks with level values assigned

Buy Now
Questions 18

Scenario 3: Printary is an American company that offers digital printing services. Creating cost-effective and creative products, the company has been part of the printing industry for more than 30 years. Three years ago, the company started to operate online, providing greater flexibility for its clients. Through the website, clients could find information about all services offered by Printary and order personalized products. However, operating online increased the risk of cyber threats, consequently, impacting thebusiness functions of the company. Thus, along with the decision of creating an online business, the company focused on managing information security risks. Their risk management program was established based on ISO/IEC 27005 guidelines and industry best practices.

Last year, the company considered the integration of an online payment system on its website in order to provide more flexibility and transparency to customers. Printary analyzed various available solutions and selected Pay0, a payment processing solution that allows any company to easily collect payments on their website. Before making the decision, Printary conducted a risk assessment to identify and analyze information security risks associated with the software. The risk assessment process involved three phases: identification, analysis, and evaluation. During risk identification, the company inspected assets, threats, and vulnerabilities. In addition, to identify the information security risks, Printary used a list of the identified events that could negatively affect the achievement of information security objectives. The risk identification phase highlighted two main threats associated with the online payment system: error in use and data corruption After conducting a gap analysis, the company concluded that the existing security controls were sufficient to mitigate the threat of data corruption. However, the user interface of the payment solution was complicated, which could increase the risk associated with user errors, and, as a result, impact data integrity and confidentiality.

Subsequently, the risk identification results were analyzed. The company conducted risk analysis in order to understand the nature of the identified risks. They decided to use a quantitative risk analysis methodology because it would provide more detailed information. The selected risk analysis methodology was consistent with the risk evaluation criteria. Firstly, they used a list of potential incident scenarios to assess their potential impact. In addition, the likelihood of incident scenarios was defined and assessed. Finally, the level of risk was defined as low.

In the end, the level of risk was compared to the risk evaluation and acceptance criteria and was prioritized accordingly.

Which of the following situations indicates that Printary identified consequences of risk scenarios? Refer to scenario 3.

Options:

A.

Printary concluded that the complicated user interface could increase the risk of user error and impact data integrity and confidentiality

B.

Printary used the list of potential incident scenarios and assessed their impact on company's information security

C.

Printary identified two main threats associated with the online payment system: error in use and corruption of data

Buy Now
Exam Code: ISO-IEC-27005-Risk-Manager
Exam Name: PECB Certified ISO/IEC 27005 Risk Manager
Last Update: Nov 17, 2024
Questions: 60
$57.75  $164.99
$43.75  $124.99
$36.75  $104.99
buy now ISO-IEC-27005-Risk-Manager