To prepare for a new Nutanix installation, a consultant downloads the Foundation VM, imports the VM to their Desktop Virtualization Solution, and powers on the VM. The IPv4 static address on the host workstation and the Foundation VM have been configured, but pings between them fail.
Which two troubleshooting steps should the consultant perform? (Choose two.)
A consultant has deployed a new Nutanix AHV cluster with Foundation. The customer requests separating the management and production traffic in the CVM.
Which feature should the consultant configure?
A consultant needs to review a customer’s switch port configuration to identify any issues. Other customer requirements are as follows:
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?
During the Foundation imaging process, nodes are successfully imaged, but the cluster creation fails.
Which log should the consultant review to determine the cause?
A customer has an ESXi Cluster with two 10GbE NICs on each node with the following requirements:
* Solution must follow Nutanix Best Practices
* Network configuration should be redundant
* A vSphere Standard Switch must be utilized
Which load balancing method should be used?
Refer to the exhibits.
A consultant is trying to test port failover on the node shown in the first exhibit. A continuous ping test is performed to the host. The consultant shuts down one of the links, after which the host ping request times out. The consultant tries to troubleshoot the issue with the customer and sees the information shown in the second exhibit on their Cisco Switches:
What is causing the issue?
A consultant is preparing to foundation over a customer network that has the following criteria:
* VLAN segmented network
* VLAN tags on the nodes must be imaged prior to starting the foundation process.
For each node, the consultant has done the following:
* Connected to the Network Crash Cart of the Node
* Logged in using “root” credentials
What should the consultant do next?
After uploading a hypervisor ISO during the Foundation process, a consultant sees a message that the MD5 sum for the hypervisor is not found in the Whitelist file.
Which step should the consultant take next to resolve this issue?
A consultant creates a Windows VM after installing a new Nutanix cluster running AHV. The consultant has statically assigned an IP address to the VM but it is unable to communicate on the network.
Which action should the consultant take to resolve this issue?
A customer wants to use NIC teaming on an ESXi host using a vSphere Standard Switch configured with the Route based on physical NIC load load balancing option. The customer does not see the option when editing the Teaming and Failover settings for the switch.
How should the consultant resolve this issue?
A consultant creates three storage containers (container-1, container-2, container-3). The customer requires that only container-1, which will be utilized as an NFS datastore, be presented to external hosts.
However, users are able to mount all three containers.
What is causing this problem?
A consultant is planning an installation and needs to collect configuration items to be used during the install. The data needed from the customer are IP addresses, Gateway, DNS servers, and NTP Servers.
Which Cluster Deployment document must be completed with the customer?
Refer to the exhibit.
A consultant is deploying a cluster using the customer-provided IP addressing information.
Which option in Foundation must be configured to ensure connectivity during the deployment?
A consultant is deploying a two-node cluster at a remote branch office.
Which component must be available to complete cluster configuration?
A consultant finishes creating a new ESXi cluster. The consultant connects to the nodes via laptop and a personal flat switch. The host/CVM network is on VLAN 23. The customer has the native VLAN on the ToR switches set to 23.
The customer wants to use LACP. Before placing the nodes on the customer network, the consultant tags VLAN 23 for each host and CVM. The consultant connects the nodes to the customer network and finds that they are unreachable.
What is causing this issue?
A consultant is deploying a Nutanix cluster at a customer location. The consultant will be deploying the latest AOS along with the latest Nutanix hardware.
Which three references should the consultant review prior to this installation? (Choose three.)
A consultant has deployed a Nutanix cluster with AOS 5.10.x, then discovers the customer’s environment is running on AOS 5.6.x. The consultant decides to re-image the cluster using the foundation Java applet. During the Foundation discovery, all cluster nodes display a status of Unavailable.
What should the consultant do to resolve the issue?
A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.
Which configuration is causing this issue?
A consultant is viewing an ESXi host via console without external network connectivity.
Which two IP addresses can be used to connect to the CVM (Choose two.)