The use of MERV 13 (F7) air filters is required to obtain what credit?

Options:

A.

Energy and Atmosphere Credit, Advanced Energy Metering

B.

Energy and Atmosphere Credit, Optimize Energy Performance

C.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

D.

Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan

Buy Now
Questions 5

The project architect suggests reducing the area planned for surface parking and replacing it with additional green space. What benefit would this strategy provide to the owner?

Options:

A.

Increase the rainwater infiltration capacity

B.

Decrease the amount of bicycle parking that must be provided

C.

Increase the overall SR (solar reflectance) of the hardscape area

D.

Decrease the required amount of on-street parking that must be provided

Buy Now
Questions 6

During value engineering a project team is looking to see if they can reduce the number of thermal comfort controls. The project's LEED AP notices there are thermostats in the public restroom and says they can be eliminated because public restrooms are considered

Options:

A.

unoccupied space

B.

densely occupied space

C.

shared multioccupant space

D.

nonregularly occupied space

Buy Now
Questions 7

To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?

Options:

A.

Up to three layers of a floor assembly

B.

Items that are demolished and not replaced

C.

The interior side of exterior windows and doors

D.

Hazardous materials that are remediated as part of the project

Buy Now
Questions 8

A project team member has prepared a map and an accompanying table as documentation for Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses. The map includes the location of each use, the location of the project, and the main entrance of the building. The table includes the distance to each use, the name of each use, and the category of each use. The team lead reviews the documentation and notes an important missing item. Which of the following s the most important item to add to the documentation?

Options:

A.

A description of each use

B.

The location of parking lots near each use

C.

Walking routes from the project to each use

D.

A calculation of the expected number of project occupants who will visit each use

Buy Now
Questions 9

The project material costs for Building Product Disclosure and Optimization cost-based credits are

Options:

A.

actual costs, furniture included

B.

default costs, 30% of total construction cost

C.

actual costs, furniture optional

D.

default costs, 40% of total construction cost

Buy Now
Questions 10

A photovoltaic (PV) system was installed after commissioning (Cx) was completed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

Options:

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission their own installations and share the results with the project owner

C.

The building's electrical engineer should commission the installation and share the results with the project owner

D.

The Cx agent for the project must return and conduct or oversee the commissioning of the PV system

Buy Now
Questions 11

In addition to the basic requirements for Energy and Atmosphere, Fundamental Commissioning and Verification, which is required to achieve Energy and Atmosphere, Enhanced Commissioning, Option 1?

Options:

A.

Develop and implement a commissioning plan

B.

Review the contractor's submittals for compliance with design documents

C.

Verify the installation and performance of the systems being commissioned

D.

Review the owner's requirements and the basis of design for clarity and completeness

Buy Now
Questions 12

Occupancy numbers must be reported consistently across multiple LEED credits. Which of the following prerequisites/credits require using the Occupancy numbers?

Options:

A.

Location and Transportation Credit, Bicycle Facilities;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Prerequisite Minimum Indoor Environmental Quality Performance

B.

Location and Transportation Credit, Access to Quality Transit;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Credit, Quality Views

C.

Location and Transportation Credit, Bicycle Facilities;

Indoor Environmental Quality Prerequisite Minimum Indoor Environmental Quality Performance;

Indoor Environmental Quality Credit, Quality Views

D.

Location and Transportation Credit, Access to Quality Transit;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Credit, Interior Lighting

Buy Now
Questions 13

Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?

Options:

A.

Taxes and delivery costs

B.

Taxes and installation costs

C.

Installation equipment and labor

D.

Transportation costs and installation labor

Buy Now
Questions 14

What is the maximum flow rate a public lavatory faucet may have if a project is pursuing prescriptive compliance for Water Efficiency Prerequisite?

Options:

A.

0.25 gpm (0.9 lpm)

B.

0.4 gpm (1.5 lpm)

C.

0.8 gpm (3.0 lpm)

D.

1.0 gpm (3.8 lpm)

Buy Now
Questions 15

A mechanical engineer needs to determine the number of carbon dioxide monitors needed for the public area of a hotel. The public area includes the hotel front desk, the hotel lobby, two public restrooms and one corridor.

The aim is to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Additional Enhanced IAQ Strategies, Part C. Carbon Dioxide Monitoring. The project's LEED AP

should recommend a minimum of how many CO2 monitors?

Options:

A.

One

B.

Two

C.

Four

D.

Five

Buy Now
Questions 16

A tenant moves into an existing building where no modifications to the building envelope will be made. What credit would be affected by the visible light transmittance of the existing exteriorglazing?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Indoor Environmental Quality Credit, Quality Views

C.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

D.

Energy and Atmosphere Credit, Fundamental Commissioning and Verification

Buy Now
Questions 17

A project team is pursuing certification for a medical clinic with 150 full time employees and 250 peak visitors. The project team is considering the Location and Transportation Credit for Bicycle Facilities. Providing which of the following is a minimum requirement to earn the credit?

Options:

A.

A bicycle maintenance program for employees

B.

At least one on-site shower and changing facility for employees

C.

Seven short-term bicycle storage spaces within 50 ft. (15 m) of the project's main entrance

D.

Six long-term bicycle parking spaces within 50 ft. (15 m) of the project's main entrance

Buy Now
Questions 18

What strategy contributes to achievement of Materials and Resources Credit, Construction and Demolition Waste Management?

Options:

A.

Reuse existing plumbing fixtures

B.

Use on-site soil to re-grade garden

C.

Reuse furniture from the existing space

D.

Return removed carpet to the manufacturer

Buy Now
Questions 19

A single tenant occupies an entire building but wishes to renovate and achieve LEED certification on only a portion of the building. This is possible if

Options:

A.

the project boundary includes 75% of the construction scope and is drawn at a clear, physical barrier

B.

the project boundary includes 100% of the construction scope and is drawn at a clear, physical barrier

C.

the project boundary excludes no more than 40% of the construction scope and is drawn at a clear, physical barrier

D.

the project boundary excludes no more than 60% of the construction scope and is drawn at a clear, physical barrier

Buy Now
Questions 20

The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?

Options:

A.

Health club, Laundromat, Post office, Restaurant

B.

Hair salon, Movie Theater, Pharmacy, Restaurant

C.

Clothing store, Commercial office, Eye doctor, Supermarket

D.

Convenience store, Furniture store, Hardware store, Pharmacy

Buy Now
Questions 21

What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?

Options:

A.

Choosing energy efficient systems

B.

Conducting a simple box energy model

C.

Implementing passive design strategies

D.

Performing commissioning of energy systems

Buy Now
Questions 22

A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?

Options:

A.

10%

B.

15%

C.

20%

D.

25%

Buy Now
Questions 23

Which of the following statements is correct when defining the project boundary?

Options:

A.

The project boundary must be defined by the limit of construction

B.

The LEED project boundary cannot include more than one building

C.

The gross floor area of the LEED project should be no less than 1,000 ft2 (93 m2)

D.

Contiguous land that is associated with the project that is altered as a result of construction must be included

Buy Now
Questions 24

Which of the following can be considered pre-consumer recycled content?

Options:

A.

Aluminum cans used to make sheet metal

B.

Plastic bottles that are used to create upholstery fabric

C.

Sawdust from a lumber mill used to make composite board

D.

Glass manufacturing scraps (culls) that are used to create new glass

Buy Now
Questions 25

A client has moved into a building that has photovoltaic panels installed on the roof. Which credit applies?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Energy and Atmosphere Credit, Renewable Energy Production

C.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

D.

Materials and Resources Credit, Interiors life-cycle impact reduction

Buy Now
Questions 26

For an Interior Design and Construction project to earn Innovation Credit, LEED Accredited Professional, who must submit their credentials as a principal participant of the project team?

Options:

A.

The project administrator

B.

A LEED AP without specialty

C.

The LEED AP with any specialty

D.

The LEED AP with ID+C specialty

Buy Now
Questions 27

For a retail LEED Interior Design and Construction project, the products include 25% by cost Cradle to Cradle v3, Gold certified products, and 25% by cost products assessed with the GreenScreen List Translator. Which of the following Materials and Resources and Innovation credits can the project team achieve?

Options:

A.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction Option 3. Design for Flexibility and Innovation Credit, Exemplary Performance

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

1. Material Ingredient Reporting and Innovation Credit, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

2. Material Ingredient Optimization and Innovation Credit, Exemplary Performance

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices and Innovation Credit, Exemplary Performance

Buy Now
Questions 28

The Commissioning Authority (CxA) must report results, findings and recommendations directly to the

Options:

A.

owner

B.

architect

C.

contractor

D.

project manager

Buy Now
Questions 29

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

Options:

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Buy Now
Questions 30

To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?

Options:

A.

10%

B.

20%

C.

30%

D.

50%

Buy Now
Exam Code: LEED-AP-ID+C
Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Last Update: Nov 17, 2024
Questions: 100
$64  $159.99
$48  $119.99
$40  $99.99
buy now LEED-AP-ID+C