LEED-AP-BD+C Sample Questions Answers

Questions 4

Which site preparation and construction method contributes to earning the Materials and Resources Credit, Construction and Demolition Waste Management?

Options:

A.

Reuse excavated soil and land-clearing debris

B.

Implement in situ soil remediation and post removal of the existing concrete pavement

C.

Salvage and recycle 50% of the existing materials (based on volume) generated during site demolition for three material streams

D.

Ensure reduction of pollution from construction activities by using airborne dust generation capture systems

Buy Now
Questions 5

Which of the following is true regarding LEED Pilot Credits?

Options:

A.

Pilot Credits are not specific to the rating systems

B.

Pilot Credits can be attempted in the design review stage only

C.

A registered Pilot Credit must be replaced on the LEED project's scorecard if that pilot credit is removed from the Pilot Credit Library

D.

Pilot Credit feedback surveys must be completed

Buy Now
Questions 6

A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?

Options:

A.

Site's impervious cover

B.

Project density calculations

C.

Erosion and sediment control plan during construction

D.

Air quality as a result of off gassing that occurs as concrete cures

Buy Now
Questions 7

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if

Options:

A.

the Phase II ESA uncovers suspected contamination

B.

contamination was identified by the certified facility

C.

the certified facility's Phase I ESA is older than 180 days

D.

the local equivalent standard is more stringent than ASTM E1527-05

Buy Now
Questions 8

A project is designed to remodel an existing warehouse into multi-family housing. The exterior facade of the warehouse will remain, but 40% of the interior will be demolished and replaced for interior new construction. New materials will be used for the new construction. To achieve points in the Materials and Resources Credit, Building Life-Cycle Impact Reduction, which credit path option would apply?

Options:

A.

Historic Building Reuse

B.

Building and Material Reuse

C.

Whole-Building Life-Cycle Assessment

D.

Renovation of Abandoned or Blighted Building

Buy Now
Questions 9

A topographic assessment of a project site located 150 ft. (45 m) from a water body was conducted. The results of the slope analysis show that the site is generally sloping 6% to 8% to the northwest over most of the site, with some steep slopes located at the eastern edge of the property, which may impact the runoff volume. Which one of the following LEED credits or prerequisites will be affected by these results?

Options:

A.

Sustainable Sites Credit, Rainwater Management

B.

Sustainable Sites Prerequisite, Environmental Site Assessment

C.

Location and Transportation Credit, Sensitive Land Protection

D.

Location and Transportation Credit, High-Priority Site

Buy Now
Questions 10

Which of the following products must always be included in Materials and Resources credits?

Options:

A.

Faucets

B.

Furniture

C.

Interior Paint

D.

Fire suppression system

Buy Now
Questions 11

If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term

bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle

Facilities?

Options:

A.

Three

B.

Four

C.

Five

D.

Ten

Buy Now
Questions 12

Which energy efficient lamp type is free from mercury?

Options:

A.

Compact Fluorescent

B.

High Pressure Sodium

C.

Light Emitting Diode

D.

T-8 Fluorescent

Buy Now
Questions 13

What is the definition of the evapotranspiration rate?

Options:

A.

Evaporation of onsite reuse water

B.

Percentage of potable water usage for irrigation

C.

Water loss from evaporation in micro irrigation systems

D.

Amount of water loss in a vegetated surface in units of water depth

Buy Now
Questions 14

Which of the following should be analyzed when pursuing an Integrative Design Process focusing on Energy-Related

Systems?

Options:

A.

Site conditions

B.

Potable water availability

C.

Acoustic performance of the project

D.

Applicability of Green Vehicles to the project

Buy Now
Questions 15

What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.

One

B.

Two

C.

Four

D.

Six

Buy Now
Questions 16

A project team member has prepared a map and accompanying table as documentation for the Location and Transportation Credit. Surrounding Density and Diverse Uses. Option 2. Diverse Uses. The map includes the location of each diverse use. the location of the project and the main entrance of the building. The table includes the distance to each use. the name of each use and the category of each use The team lead reviews the documentation and notes an important missing item. Which of the following is the most important item to add to the documentation?

Options:

A.

A description of each use

B.

The location of parking lots near each use

C.

Walking routes from the project to each use

D.

A calculation of the expected number of project occupants who will visit each use

Buy Now
Questions 17

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Buy Now
Questions 18

The required minimum scope of analysis for a product-specific declaration that contributes toward Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations, Option 1. Environmental Product Declaration is

Options:

A.

gate-to-gate

B.

cradle-to-gate

C.

cradle-to-grave

D.

cradle-to-cradle

Buy Now
Questions 19

What building classification requires the energy model to determine the predicted power usage effectiveness (PUE) for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

Office

B.

Hospital

C.

Warehouse

D.

Data Center

Buy Now
Questions 20

The total land area within a 1/4 mi. (0.40 km) radius of a project boundary consists of 130 acres (53 hectares) and has a residential to nonresidential ratio of 60:40. Within this same total land area, there are 780 dwelling units and 1,600,000 ft2 (148 645 m2) of nonresidential building space. Given these parameters, what are the surrounding residential and nonresidential densities when attempting to achieve Location and Transportation Credit, Surrounding Density and Diverse Uses?

Options:

A.

10 dwelling units per acre (24 dwelling units per hectare) and a Floor Area Ratio (FAR) of 0.47

B.

10 dwelling units per acre (24 dwelling units per hectare) and a FAR of 0.70

C.

13 dwelling units per acre (32 dwelling units per hectare) and a FAR of 0.47

D.

15 dwelling units per acre (36 dwelling units per hectare) and a FAR of 0.70

Buy Now
Questions 21

Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?

Options:

A.

The ESC plan cannot be modified during the design phase of the LEED certification

B.

The ESC plan can be developed or modified during the design phase of LEED certification

C.

A compliant ESC plan may be developed during construction

D.

A compliant ESC plan must be in place when the commissioning authority is appointed

Buy Now
Questions 22

Smoking is prohibited inside LEED-certified buildings in order to eliminate the health risks associated with environmental tobacco smoke. Which building type is exempt from this requirement?

Options:

A.

Office projects

B.

Healthcare projects

C.

Warehouse projects

D.

Residential projects

Buy Now
Questions 23

A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?

Options:

A.

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Indoor Water Use Reduction

B.

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Outdoor Water Use Reduction

C.

Sustainable Sites Credit, Rainwater Management and Water Efficiency Credit, Indoor Water Use Reduction

D.

Sustainable Sites Credit, Rainwater Management and Water Efficiency Prerequisite, Indoor Water Use Reduction

Buy Now
Questions 24

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

Options:

A.

Total fixture power

B.

Site area of the project

C.

Quantity of installed luminaires

D.

Total fixture lumens below 90 degrees

Buy Now
Questions 25

What Color Rendering Index (CRI) value meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.

45

B.

85

C.

25

D.

65

Buy Now
Questions 26

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

Options:

A.

A garden space dedicated to industrial food production for use by local communities

B.

A garden space with only one vegetation type and species during the summer for visual interest

C.

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Buy Now
Questions 27

A project team is providing additional ventilation under Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies. What credit could this adversely affect?

Options:

A.

Energy and Enhanced Commissioning

B.

Indoor Environmental Quality, Thermal Comfort

C.

Energy and Atmosphere, Optimize Energy Performance

D.

Indoor Environmental Quality, Interior Lighting

Buy Now
Questions 28

For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for

Options:

A.

site conditions

B.

massing and orientation

C.

plug and process load needs

D.

building envelope performance

Buy Now
Questions 29

A downtown office building is unable to construct dedicated parking for its occupants. However, the building developer has partnered with a parking garage to offer discounted parking for its occupants. If the discounted parking rate is $450 per month, how much must the rate be for green vehicles for the building to receive one point for Location and Transportation Credit, Green Vehicles?

Options:

A.

$90

B.

$225

C.

$360

D.

$405

Buy Now
Questions 30

Which of the following are all considered regular building occupants?

Options:

A.

Staff, primary/secondary students, volunteers, and residents

B.

Staff, primary/secondary students, higher education students, and residents

C.

Higher education students, retail customers, periodic volunteers, and visitors

D.

Residents, volunteers, retail customers, and staff

Buy Now
Questions 31

Which of the following methods is the referenced standard for demonstrating compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.

ASHRAE 62.2 - 2007

B.

ASHRAE 90.1 - 2010

C.

ASHRAE 55 - 2010

D.

ASHRAE 62.1 - 2010

Buy Now
Questions 32

The Sustainable Sites Credit, Heat Island Reduction takes into account both new and three-year aged Solar Reflectance Index (SRI) values for roofing material because

Options:

A.

SRI generally increases with age

B.

SRI generally decreases with age

C.

SRI generally remains the same with age

D.

SRI generally does not impact the Heat Island Effect

Buy Now
Questions 33

The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?

Options:

A.

0.144 CFM/ft2 (0.73 (L/s)/m2)

B.

0.156 CFM/ft2 (0.79 (L/s)/m2)

C.

0.168 CFM/ft2 (0.85 (L/s)/m2)

D.

0.30 CFM/ft2 (1.5 (L/s)/m2)

Buy Now
Questions 34

For an emergency care facility project, which of the following credits can be achieved if the total cost of

permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator?

Options:

A.

Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Material Reuse

& Innovation Credit, Innovation, Exemplary Performance

B.

Materials and Resources Credit, Furniture and Medical Furnishing, Option 3. Multi-Attribute Assessment of

Products & Innovation Credit, Innovation, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2.

Material Ingredient Optimization & Innovation Credit, Innovation, Exemplary Performance

D.

Materials and Resources Credit, Furniture and Medical Furnishings, Option 3. Multi-Attribute Assessment of

Products & Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2. Material Ingredient Optimization

Buy Now
Questions 35

A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum

Energy Performance, what option is used?

Options:

A.

Whole building simulation

B.

EPA target finder rating tool

C.

Green-e Energy

D.

Advanced building core performance guide

Buy Now
Questions 36

Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for

project development?

Options:

A.

U.S. Internal Revenue Service

B.

U.S. Department of Agriculture

C.

U.S. Environmental Protection Agency

D.

U.S. Department of Housing and Urban Development

Buy Now
Questions 37

For a project located on a greenfield site and attempting the Location and Transportation Credit, Sensitive Land Protection, Option 2, what must the development footprint avoid?

Options:

A.

Land that is within 200 ft. (61 m) of a local government wetland demonstration project

B.

Soils that are to be restored according to the SITES Guidelines and Performance Benchmarks 2009. Credit 7.3

C.

Areas not able to meet the criteria for Location and Transportation Credit LEED for Neighborhood Development Location

D.

Prime farmland as defined by the U.S. Code of Federal Regulations or local equivalent outside the US

Buy Now
Questions 38

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.

Measure densities within a ¼ mile (0.40 km) radius of the project boundary

B.

Measure densities within a ¾ mile (1.20 km) radius of the project boundary

C.

Measure densities within a ⅓ mile (0.53 km) radius of the project boundary

D.

Measure densities within a ½ mile (0.80 km) radius of the project boundary

Buy Now
Questions 39

A building owner in an arid climate is trying to design an outdoor lunch area for the tenants. Which landscaping strategy is important to employ in order to reduce water demand?

Options:

A.

Large maple trees for shading

B.

Xeriscaping landscape beds

C.

Turf grass area for picnic benches

D.

Tropical flowers next to park benches

Buy Now
Questions 40

The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.

What credits should the LEED AP suggest to meet this goal?

Options:

A.

Sustainable Sites Credit, Heat Island Reduction and Location and Transportation Credit, Bicycle Facilities

B.

Location and Transportation Credit, Access to Quality Transit and Location and Transportation Credit, Sensitive Land Protection

C.

Location and Transportation Credit, Surrounding Density and Diverse Uses and Sustainable Sites Credit, Open Space

D.

Location and Transportation Credit, Reduced Parking Footprint and Location and Transportation Credit, Access to Quality Transit

Buy Now
Questions 41

A new building containing private offices is pursuing Location and Transportation Credit, Access to Quality Transit. Which would comply?

Options:

A.

Locate the project ¼ mile (0.4 km) walking distance from two campus bus system lines (only accessible to campus students) with two stops each

B.

Locate the project ½ mile (0.8 km) walking distance from two bus lines with two stops each

C.

Locate the project ¼ mile (0.4 km) walking distance from a planned, funded, and partially complete subway station

D.

Locate the project ½ mile (0.8 km) walking distance from a planned, not funded commuter rail

Buy Now
Questions 42

Under Energy and Atmosphere Credit: Optimize Energy Performance, Option 1: Whole-Building Energy Simulation, how can the energy cost savings be accurately determined?

Options:

Buy Now
Questions 43

A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

Options:

A.

12,500 ft2 (1 160 m2)

B.

15,000 ft2 (1 400 m2)

C.

25,000 ft2 (2 300 m2)

D.

35,000 ft2 (3 250 m2)

Buy Now
Questions 44

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.

Measure densities within a 1/4 mi. (0.40 km) radius of the project boundary

B.

Measure densities within a 1/2 mi. (0.80 km) radius of the project boundary

C.

Measure densities within a 1/3 mi. (0.53 km) radius of the project boundary

D.

Measure densities within a 3/4 mi. (1.20 km) radius of the project boundary

Buy Now
Questions 45

When calculating the reverberation time of a room, which of the following pieces of information is least relevant?

Options:

A.

Height and width of room

B.

Noise reduction coefficient of the ceiling surface

C.

Sound absorption coefficient of the floor surface

D.

Operating sound level of nearest HVAC equipment

Buy Now
Questions 46

An office is relocating to a new facility. Any furniture that is relocated to the new site can contribute as a reused material for Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials if it was purchased:

Options:

A.

At least two years prior to the date of project registration

B.

Within the past five years

C.

Within two years of the substantial completion of the project

D.

At least five years prior to the certification of the project

Buy Now
Questions 47

What is the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf)?

Options:

A.

1.05 gpf (4 lpf)

B.

1.19 gpf (4.5 lpf)

C.

1.23 gpf (4.66 lpf)

D.

1.32 gpf (5 lpf)

Buy Now
Questions 48

What document allows a LEED AP to register a project and sign the Certification Agreement?

Options:

A.

Owner Confirmation of Agent Authority

B.

Architect Code of Professional Conduct

C.

Commissioning (Cx) Agent Construction Permit

D.

LEED AP Standard Form of Agreement Between Owner and Architect

Buy Now
Questions 49

A core and shell project is located in a dense urban area that is known to have frequent fluctuations in the power supply grid (brown-outs). The project team is seeking LEED Platinum certification. Which credit should be pursued when considering the regional context?

Options:

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Credit, Green Power and Carbon Offset

D.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

Buy Now
Questions 50

Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?

Options:

A.

Burning fossil fuels

B.

Smoking tobacco products

C.

Preparing non-organic foods

D.

Manufacturing toxic chemicals

Buy Now
Questions 51

The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced

Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?

Options:

A.

Verify that training requirements are completed

B.

Develop systems manual for the commissioned systems

C.

Review contractor submittals for the commissioned systems

D.

Verify installation and performance of the commissioned systems

Buy Now
Questions 52

What is a viable strategy for optimizing open space under Sustainable Sites Credit, Open Space? U

Options:

A.

Coordinate open space features during the construction phase

B.

Minimize the floor-area ratio (FAR) and accessibility for open space

C.

Design a parking and road footprint layout that is not near open land

D.

Coordinate open space features early during the site planning phase

Buy Now
Questions 53

Which of the following assessments is conducted prior to the completion of the schematic design and explores methods to reduce energy use within a proposed building?

Options:

A.

Energy audit

B.

Building systems commissioning (Cx)

C.

Simple box energy analysis

D.

Mechanical systems inspection

Buy Now
Questions 54

A project has a potable water source as well as two alternative water sources. Which of the following statements is applicable for a project using two alternative water sources?

Options:

A.

A project may not use two alternative water sources

B.

Target the uses that require the least treatment first

C.

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.

All alternative water sources should be treated to potable water standards

Buy Now
Questions 55

What is the maximum number of points a project pursuing LEED for New Construction can achieve under Location

and Transportation Credit, Access to Quality Transit?

Options:

A.

Two points

B.

Three points

C.

Four points

D.

Five points

Buy Now
Questions 56

During a design charrette, community neighbors raise a concern about potential glare resulting from a project's highly reflective roof. Which change should the LEED AP recommend to best address these concerns without negatively impacting other LEED credits?

Options:

A.

Change the design to incorporate rooftop solar panels

B.

Change the roofing material to a dark material to eliminate the issue

C.

Change the design to reduce the amount of roofing area

D.

Change the design to include a vegetative roofing system

Buy Now
Questions 57

The material cost for a project is $100,000. What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction

Practices?

Options:

A.

$10,000

B.

$12,500

C.

$22,500

D.

$25,000

Buy Now
Questions 58

During preliminary energy analysis, what energy reduction strategies can best help in reducing the energy load in the new building construction project?

Options:

A.

Green roof

B.

Site conditions

C.

Massing and orientation

D.

Programmatic and operational parameters

Buy Now
Questions 59

Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?

Options:

A.

Any changes in schedules or setpoints for different seasons, days of the week, and times of day

B.

Only changes in schedules or setpoints for peak usages during seasons, days of the week, and times of day

C.

Any changes in schedules during peak times, or for different seasons, peak-usage days of the week, and times of day

D.

Any changes in schedules or setpoints focusing on only the hottest and coldest periods of the seasons, peak-use days of the week, and times of day

Buy Now
Questions 60

Which of these is a method to assess the regional context of a building's design for sustainability?

Options:

A.

Conducting a site analysis

B.

Consulting with neighbors

C.

Improving a design threshold

D.

Performing an energy analysis of the building

Buy Now
Questions 61

Sustainable Sites Credit, Site Assessment requires evaluation of

Options:

A.

soils, archeology, hydrology

B.

topography, hydrology, human use

C.

vegetation, topography, archaeology

D.

human health effects, climate, land value

Buy Now
Questions 62

Which is a benefit of earning Regional Priority credits?

Options:

A.

The LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project's location

B.

The context of the project's location is not addressed, allowing the project team to focus on the building's priority issues

C.

The project's operations are considered separately from design and construction, allowing the project team to focus on regional issues

D.

The LEED project is able to skip a review phase by considering the issues that are a priority in the project's location

Buy Now
Questions 63

Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

Options:

A.

Planting density, soil conditions, irrigation efficiency and rainfall

B.

Relative humidity, site exposure, plant species and planting density

C.

Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency

D.

Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency

Buy Now
Questions 64

At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's

Options:

A.

environmental zone

B.

longitude and latitude

C.

ASHRAE 90.1 - 2010 climate zone

D.

Environmental Protection Agency Phase I Assessment

Buy Now
Questions 65

For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

Options:

A.

five bicycle trails

B.

at least eight diverse uses

C.

a restaurant, a grocery shop, a post office and two bus lines

D.

a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary

Buy Now
Questions 66

Which of the following requires standard appliances for indoor water reduction?

Options:

A.

CEE Tier 3A

B.

GreenSeal

C.

ASHRAE Standard 62.1-2010

D.

ISO 14044-2006

Buy Now
Questions 67

An accessible garden planted with native plants contributes to the achievement of which of the following credit pairs?

Options:

A.

Sustainable Sites Credit, Sensitive Land Protection; Sustainable Sites Credit, Site Development - Protect or Restore Habitat

B.

Sustainable Sites Credit, Open Space; Sustainable Sites Credit, Rainwater Management

C.

Water Efficiency Credit, Water Metering; Sustainable Sites Credit, Tenant Design and Construction Guidelines

D.

Location and Transportation Credit, Surrounding Density and Diverse Uses; Sustainable Sites Credit, Site Assessment

Buy Now
Questions 68

Which of the following would be most useful to a school project that is attempting to pursue Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A standard garbage disposal

B.

Electronic submeter at the domestic water supply pipe to the building

C.

An open-loop HVAC system that discharges potable cooling water to a nearby lake

D.

Commercial dishwasher that is ENERGY STAR® labeled or performance equivalent

Buy Now
Questions 69

A contractor is building a retirement community project. 30% of the building's product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?

Options:

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials

B.

Materials and Resources Prerequisite, Construction and Demolition - Waste Management Planning

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

Buy Now
Questions 70

According to the Integrative Process Credit, the discovery phase of energy-related systems should identify

Options:

A.

ventilation rates

B.

functional performance tests

C.

thermal comfort ranges

D.

transportation options

Buy Now
Questions 71

Which of the following is omitted from the assessment while performing preliminary energy modeling?

Options:

A.

Massing and orientation

B.

Thermal comfort ranges

C.

Supply sources

D.

Plug and process loads

Buy Now
Questions 72

Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

Options:

A.

it is being covered by Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

B.

it is specifically exempted by ASHRAE

C.

it will be installed by the owner

D.

the lamp wattage has not been determined

Buy Now
Questions 73

A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

Options:

A.

Compliance Path 2: Usage-Based Calculation; prescriptive compliance confirmation

B.

Compliance Path 2: Usage-Based Calculation; appliance water calculations

C.

Compliance Path 1: Prescriptive Achievement; indoor water use calculations

D.

Compliance Path 1: Prescriptive Achievement; product cutsheets

Buy Now
Questions 74

What role does the LEED AP have when creating the Owner's Project Requirements (OPR) document?

Options:

A.

Oversees the design team writing the OPR

B.

Authors the OPR with the design team

C.

Publishes the completed OPR

D.

Helps the owner develop the OPR

Buy Now
Questions 75

In the Indoor Environmental Quality Credit, Low-Emitting Materials, what types of products need to be evaluated for

both Volatile Organic Compound (VOC) content of the material and VOC emissions of the material?

Options:

A.

Flooring

B.

Furniture

C.

Composite wood

D.

Wet applied products

Buy Now
Questions 76

In order to comply with Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2, Additional Enhanced Air Quality Strategies:

Options:

A.

All entrances to the building must have entryway systems 10 ft. (3 m) long in the direction of travel

B.

All particle filters in the ventilation system must meet Comité Européen de Normalisation (CEN) standard Class F7 or better

C.

CO₂ monitors must be fitted in all densely occupied spaces and configured to provide an alert

D.

All outdoor air supply systems must have an airflow measurement device that measures at least 90% of the airflow

Buy Now
Questions 77

Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?

Options:

A.

Installing bioretention area

B.

Installing on-site renewable power generation facility

C.

Substituting impervious surface area with high-albedo paving materials

D.

Increase artificial turf on the roof

Buy Now
Questions 78

For minimum acoustic performance, peak-hour is defined as M

Options:

A.

lowest noise level over a specified sample time

B.

highest noise level over various periods of time

C.

an energy-average of the noise level over a specified sample time

D.

an energy-average of noise level divided by total sample time and area of the space

Buy Now
Questions 79

A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?

Options:

A.

Energy and Atmosphere Credit, Optimize Energy Performance, Exemplary Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Buy Now
Questions 80

What requirements are needed to earn Regional Priority credits?

Options:

A.

Full name and specialty credential of LEED AP

B.

Points are awarded automatically

C.

Exemplary performance

D.

Related credits registration

Buy Now
Questions 81

Which of the following prerequisites or credits are affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit. Thermal Comfort?

Options:

A.

Energy and Atmosphere Credit. Demand Response

B.

Energy and Atmosphere Credit. Advanced Energy Metering

C.

Energy and Atmosphere Prerequisite. Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite. Building Level Energy Metering

Buy Now
Questions 82

Which of the following strategies can be used to decrease the envelope load of a building?

Options:

A.

Provide summer solar shading

B.

Maximize daylighting

C.

Decrease opaque wall area

D.

Use economizers for free cooling

Buy Now
Questions 83

A building owner installs a building automation system (BAS) to allow programmable load control. Which of the

following credits can be pursued because of the installation?

Options:

A.

Energy and Atmosphere Credit, Demand Response

B Energy and Atmosphere Credit, Ongoing Commissioning

B.

Energy and Atmosphere Credit, Enhanced Commissioning

C.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

Buy Now
Questions 84

The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.

Whole-Building Life-Cycle Assessment is a

Options:

A.

gate-to-gate assessment

B.

cradle-to-gate assessment

C.

cradle-to-grave assessment

D.

cradle-to-cradle assessment

Buy Now
Questions 85

For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum percentage requirement for metering any individual energy end uses?

Options:

A.

Those that represent 10% or more of the total annual consumption of the building

B.

Those that represent 25% or more of the total annual consumption of the building

C.

Those that represent 20% or more of the total annual consumption of the building

D.

Those that represent 15% or more of the total annual consumption of the building

Buy Now
Questions 86

Minimizing light trespass is a key component of which of the following credits?

Options:

A.

Energy and Atmosphere Credit, Optimize Energy Performance

B.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

C.

Sustainable Sites Credit, Light Pollution Reduction

D.

Indoor Environmental Quality Credit, Interior Lighting

Buy Now
Questions 87

A project elects to pursue Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses because of the project's location in an amenity-rich area. The project features 18 uses overall, including at least four uses in three of the five use type categories. What threshold must the project surpass in order to demonstrate exemplary performance for Option 2?

Options:

A.

Exemplary Performance is not available for Option 2

B.

15 uses, including two uses in each of the five categories

C.

15 uses, including at least one Food Retail and one Community Anchor use

D.

18 uses, including uses in at least four of the five use type categories

Buy Now
Questions 88

What phase of the integrative process gives the team the greatest chance of success in meeting the project's environmental goals cost-effectively?

Options:

A.

Design

B.

Discovery

C.

Operations

D.

Construction

Buy Now
Questions 89

Short-term bicycle storage in Location and Transportation Credit, Bicycle Facilities must be within 100 ft. (30 m) walking distance of any:

Options:

A.

Bicycle network

B.

Emergency access

C.

Main entrance

D.

Shower room

Buy Now
Questions 90

An HVAC system consists of an air handler supplying conditioned air (mixture of return air and outdoor air) to an office, corridor, conference room and lobby. For Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance, the ventilation rate procedure calculations must be based upon what HVAC system configuration?

Options:

A.

Single-zone system

B.

Multiple-zone system

C.

Mixed-mode system

D.

100% outdoor air system

Buy Now
Questions 91

Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted,

manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The

intent of this bonus is

Options:

A.

to shorten construction duration by reducing shipping times

B.

to avoid spreading products with potentially invasive non-native pests

C.

to incentivize the purchase of products that support the local economy

D.

to promote design with indigenous materials in order to maintain local aesthetic quality

Buy Now
Questions 92

What type of space must have self-closing doors, deck-to-deck partitions, and exhaust fans in order to meet the requirements for Indoor Environmental Quality Credit, Enhanced Air Quality Strategies?

Options:

A.

Data closet

B.

Conference room

C.

Chemical storage

D.

Open office

Buy Now
Questions 93

An office project has the following items in its break room kitchen: a kitchen sink, a residential-style dishwasher, and a coffee machine. How would these items be addressed in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

The kitchen sink is included in fixture calculations, the dishwasher and coffee machine must be ENERGY STAR® or performance equivalent

B.

The kitchen sink is included in fixture calculations, the dishwasher must be ENERGY STAR® or performance equivalent, and the coffee machine is not included in the prerequisite

C.

The kitchen sink and dishwasher must be WaterSense labeled and the coffee machine is not included in the prerequisite

D.

The kitchen sink and dishwasher must be WaterSense labeled and the coffee machine should be included in fixture calculations

Buy Now
Questions 94

Commissioning (Cx) and verification are requirements to qualify for LEED certification. What are the basic systems that need to be commissioned?

Options:

A.

Electrical, Mechanical, Plumbing, and Renewable Energy

B.

Electrical, Structural, Mechanical, and Lighting

C.

Electrical, Structural, Audio Visual, and Envelope

D.

Electrical, Plumbing, Telecommunications, and Fire Suppression

Buy Now
Questions 95

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?

Options:

A.

Municipally supplied tap water

B.

Ground surface stormwater runoff

C.

Rainwater collected from the building roof

D.

Graywater from the building's hand-washing sinks

Buy Now
Questions 96

A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental

Quality Strategies, where would CO2 monitors need to be located?

Options:

A.

In each occupied space

B.

In each densely occupied space

C.

In each occupied space and outdoors

D.

In each occupied space over 500 ft2 (46 m2)

Buy Now
Questions 97

U.S. Green Building Council (USGBC)'s vision for using LEED internationally includes

Options:

A.

allowing more stringent credit requirements for countries outside of the U.S. so that all projects can achieve LEED

B.

creating multiple LEED rating systems for different countries

C.

modifying U.S. reference standards, such as ASHRAE 90.1, to be more appropriate for regions outside the U.S.

D.

providing opportunities for alternative compliance paths that meet the unique needs of a particular region

Buy Now
Questions 98

A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

Options:

A.

$75

B.

$150

C.

$750

D.

$1,500

Buy Now
Questions 99

What are the requirements of commercial projects for long-term bicycle storage under Location and

Transportation, Bicycle Facilities - Bicycle Storage and Shower Rooms?

Options:

A.

Provide for at least 5% of all regular building occupants, with no less than four storage spaces per building

B.

Provide for at least 10% of all regular building occupants, with no less than five storage spaces per building

C.

Provide for at least 15% of all regular building occupants, with no less than 10 storage spaces per building

D.

Provide for at least 25% of all regular building occupants, with no less than 10 storage spaces per building

Buy Now
Questions 100

Which strategy can maximize the efficiency of water use in an irrigation system?

Options:

A.

Determine a set rate of irrigation and avoid adjustments

B.

Set the irrigation controllers on a timer

C.

Incorporate precipitation sensors with smart irrigation controllers

D.

Space irrigation sprinkler heads for overlapping coverage

Buy Now
Questions 101

Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.

The general contractor

B.

A LEED AP

C.

The project's mechanical engineer

D.

The owner or an owner's representative

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: Mar 31, 2025
Questions: 337
$57.75  $164.99
$43.75  $124.99
$36.75  $104.99
buy now LEED-AP-BD+C