Winter Special Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

CTAL-TAE Sample Questions Answers

Questions 4

What is NOT a factor in considering when you are asked to ensure an effective transition from manual to automated tests?

Options:

A.

Complexity to automate the manual test cases

B.

Correctness of test data and test cases

C.

The look andfeel of the SUT

D.

The controllability of the SUT

Buy Now
Questions 5

Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writing the automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight’s repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value

Options:

A.

Changing thescripting approach to data-driven scripting

B.

Implementing keywords with a higher level of granularity

C.

Changing the wait mechanism to explicit hard-coded waits

D.

Establishing an error recovery process for TAS and SUT

Buy Now
Questions 6

A defect in a SUT has been resolved and validated by an automated defect re-test in the current release of the software. This retest has now been added to the automated regression test suite.

Which statement BEST describes a reason why this defect could re-occur in future releases?

Options:

A.

Automated defect confirmation testing is not effective at confirming that the resolved defect will continue to work in future releases

B.

Theconfiguration management process does not properly control the synchronization between software archives

C.

The automated regression test suite is not run consistently for future releases.

D.

The automated regression test suite has a narrower scope of functionality

Buy Now
Questions 7

Which of the following statement about the implementation of automated regression testing is FALSE?

Options:

A.

When automating regression tests, the structure of automated tests mustalways be the same as the corresponding manual tests

B.

When automating regression tests, the corresponding manual tests should have already been executed to verify they operate correctly

C.

When automating regression tests, theinitialization steps set the test preconditions should be automated wherever possible

D.

When automating regression tests, consideration should be given to how much time would be saved by automation

Buy Now
Questions 8

Designing the System Under Test (SUT) for testability is important for a good test automation approach and can also benefit manual test execution.

Which of the following is NOT a consideration when designing for testability?

Options:

A.

Observability: The SUT needs to provide interface that give insight into the system.

B.

Re-useability: The code written for the SUT must be re-useable for other similar system.

C.

Clearly defined architecture: The SUT Architecture needs to provide clear and understandable interfaces giving control and visibility on all test levels.

D.

Control: the SUT needs to provide interfaces that can be used to perform actions on SUT.

Buy Now
Questions 9

You are currently designing the TAA of a TAS. You have been asked to adopt an approach forautomatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardwareand communication links that can be unreliable.

Which of the following aspects is MOST important when designing the TAA in this scenario?

Options:

A.

Looking for tools that allows direct denoting of exceptions and actions depending on the SUT events.

B.

Adopting a test definition strategy based on classification tree coverage for the test definition layer.

C.

Looking for tools that allow performing setup and teardown of the test suites and the SUT.

D.

Adopting a test definition strategy based on use case/exception case coverage for the definition layer.

Buy Now
Questions 10

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11thtest. This test does not complete its execution and the overall execution of thesuite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11thtest?

Options:

A.

Re-run the test automation suite starting from the 12thtest

B.

Return the database to a consistent state that allows subsequent test to run

C.

Take a backup of thedatabase in its current state. So It can be analyzed later

D.

Re-run the test automation suite starting from the 1sttest.

Buy Now
Questions 11

Which of the following statements about the reuse of TAS artefacts is TRUE?

Options:

A.

Reusable TAS artefacts can include components (or parts of components) associated with different layers of the TAA

B.

To enable reuse of TAS artefacts, a good design for reuse is built into the TAA and to further action are needed during the TAS lifecycle

C.

Communications maintenance and improvements for reusing TAS artefacts are modifyaddressed during the design of the TAA

D.

Reusable TAS artifacts associated with the definition layer of the TAA include the adaptors to the SUT components and/or interfaces

Buy Now
Questions 12

A TAS uses a commercial test automation tool and the default logs generated by the inconsistent formats such as different types of messages (pass/fail steps, screenshots, warnings, etc.) To solve this issue some custom logging functions have been created from the test scripts, making it possible to log the different types of messages with the same format. However, this may cause a problem due to excessive size of the logs which can make it difficult to find the required information. Assume that all the default logs will be disabledwhen running the automated tests and that some tests will not generate excessively sized logs.

Which of the following represents the BEST suggestion for implementing the custom logging functions?

Options:

A.

Implement the custom logging functions without saving timestamps

B.

Implement the custom logging functions to support different levels of tracing

C.

Implement the custom logging functions without saving stack traces

D.

Implement the custom logging functions to redirect the logs to multiple files

Buy Now
Exam Code: CTAL-TAE
Exam Name: ISTQB Certified Tester Advanced Level, Test Automation Engineering
Last Update: Nov 21, 2024
Questions: 40
$64  $159.99
$48  $119.99
$40  $99.99
buy now CTAL-TAE