In addition to hardware monitoring, what is the purpose of the Dell PTAgent service on a VxRail node?
An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?
According to Dell best practices, which VxRail series can be deployed in either datacenters or remote locations?
What guideline should be followed when planning bandwidth between sites hosting VM objects and the witness nodes?
An implementation engineer logs in to the vSphere Client of a recently deployed VxRail cluster. They want to review the firmware versions on the VxRail nodes.
Which view should they use to gather this information?
From what environment must a network administrator run VxRail network validation?
An implementation engineer is configuring External SRS. Where can they find the installation files for SRS VE?
Which VxRail Series is designed to support a VDI environment and requires a GPU card in each host?
A systems engineer needs to check the health of the nodes and the system VMs to prevent complications or failures during VxRail upgrades. Which tool must be used to perform the task?
Where can an administrator find steps to perform a manual verification of the customer network?
What is validated by running the Proactive Network Performance test in vCenter on a VxRail cluster?
An implementation engineer is deploying a VxRail cluster with the VxRail Deployment Wizard Which user accounts must be defined for VxRail Manager?
According to the VxRail PEQ Engagement Details worksheet, links to what resources should the SE send to the customer?
When preparing to generate an As-Built Configuration Report, it is determined that the VxRail Configuration JSON file was not saved from the Deployment Wizard. What actions must be taken to retrieve the JSON file?
An implementation engineer is in the validation phase of a VxRail deployment with two Dell EMC ToR switches. Which command should they run on each of the ToR switches to validate that Link Aggregation has been configured according to Dell best practices for VxRail node interfaces?
How should an administrator manually validate the DNS readiness of a customer network?
A VxRail E560F model was delivered six months ago and is now scheduled to be installed with the target code. What is the correct order of steps to complete this task?
What is validated by running the Proactive VM Creation test in vCenter on a VxRail cluster?
An implementation engineer is deploying a new VxRail cluster What should they confirm before installing the hardware?
An implementation engineer is expanding an existing VxRail S Series cluster with an additional node. The version of the node is not at the current cluster level but is compatible.
What procedure would result in the quickest node addition?
A systems engineer needs to ensure that the VxRail system is healthy and any issues found are addressed prior to starting an upgrade process. Where in the vSphere Client can they review alarms and overall vSAN health?
A systems engineer is deploying a VxRail cluster. They want to ensure that configuration issues can be avoided when expanding this cluster.
Which actions need to be performed?