Summer Special Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

D-MSS-DS-23 Sample Questions Answers

Questions 4

Which Dell Unity XT DPE front-end port connectivity can support to 45000 IOPS/port and up to 1500 MB/s?

Options:

A.

16 Gb FC and 25 GbE iSCSI

B.

25 GbE iSCSI

C.

16 Gb FC

D.

10 GbE iSCSI and 16 Gb FC

Buy Now
Questions 5

For a PowerStore 3200T running Block Workloads, which two options does Sizer take into consideration to equate the performance for each workload? (Select 2)

Options:

A.

Throughput

B.

Frontend Performance Saturation

C.

Response Time

D.

Storage Performance Saturation

Buy Now
Questions 6

A technical architect is working with a customer to design a Dell Unity XT solution. The customer is concerned about enabling the data reduction storage service. What system condition should the architect recommend for enabling data reduction?

Options:

A.

CPU utilization above 80%

B.

Free capacity above 80%

C.

Free capacity at or less than 50% free capacity

D.

CPU utilization at or less than 50%

Buy Now
Questions 7

Which CPU family is used on a Dell Unity XT 480?

Options:

A.

Haswell

B.

Ice Lake

C.

Broadwell

D.

Skylake

Buy Now
Questions 8

What chunk size of data is identified and moved temporarily to FAST Cache within Unity?

Options:

A.

256 KB

B.

32 KB

C.

128 KB

D.

64 KB

Buy Now
Questions 9

Which two options are minimum requirements for PowerSizer Block workloads? (Select 2)

Options:

A.

Capacity Growth

B.

Performance Growth

C.

Split Workload

D.

Effective Capacity

E.

Performance

Buy Now
Questions 10

A solution architect notices the PowerSizer is translating File Operations into IOPS for cluster and appliance summary details. IOPS are not impacting the summary MiB/s. What is the cause of this issue?

Options:

A.

File Operations was entered. MiB/s was entered.

B.

File Operations was entered. MiB/s was not entered.

C.

File Operations was not entered. MiB/s was not entered.

D.

File Operations was not entered. MiB/s was entered.

Buy Now
Questions 11

What initiates an automatic NAS server failover to the peer SP?

Options:

A.

Assisted internal migration

B.

Network link failure

C.

SP hardware fault

D.

Resource balancing algorithm

Buy Now
Questions 12

A systems administrator has deployed a Dell Unity XT 380F system with 15x 1.92 TB SSD drives, in a RAID 5 dynamic pool. Shortly after deployment, the administrator wants to expand the capacity of the system and use larger drives to increase the density. What will happen if the administrator adds 4x 3.84 TB SSD drives?

Options:

A.

The full capacity of the drives will be available.

B.

Only half of the capacity of the new drives will be available.

C.

Three of the drives will be added with a fourth reserved as spare.

D.

The mixing of drive types is not supported, and the operation will fail.

Buy Now
Questions 13

What is the minimum number of IP addresses for optimal performance of PowerStoreX?

Options:

A.

7

B.

4

C.

6

D.

9

Buy Now
Questions 14

Which two workload parameters are required to proceed with sizing for a PowerStore solution? (Select 2)

Options:

A.

Response time

B.

IOPS

C.

Effective Capacity

D.

Data reduction ratio

Buy Now
Questions 15

Which tool is used to remediate issues discovered during a site evaluation?

Options:

A.

CloudIQ

B.

ECT

C.

Live Optics

D.

Grab

Buy Now
Questions 16

What information must a solution architect gather before they start designing a storage solution?

Options:

A.

Application response, LAN, and WAN requirements

B.

Network Infrastructure, Storage, and Customer workload performance requirements

C.

LAN, SAN, and IOPS requirements

D.

LAN, SAN, and Customer workload requirements

Buy Now
Questions 17

What command is used to gather data from Brocade switches?

Options:

A.

show all

B.

show tech-support details

C.

supportshow

Buy Now
Questions 18

The CPU utilization in a Dell Unity XT system is currently at 68%. What is the level of CPU utilization?

Options:

A.

Extremely High Utilization

B.

High Utilization

C.

Low Utilization

D.

Normal Utilization

Buy Now
Questions 19

A customer has a PowerStore 3200T system with only base enclosure consisting of 15 SSD 1920 GB drives and wants to expand the available capacity. What is the most cost-effective drive addition from a raw and usable capacity perspective to achieve the result wanted by the customer?

Options:

A.

6 x 1920 NVMe SSD drives

B.

6 x 3840 NVMe SSD drives

C.

6 x 750 GB NVMe SCM drives

Buy Now
Questions 20

When designing a system to support Oracle OLAP Workload for a new customer with no I/O details, what are the default selections for the I/O profile input in sizer?

Options:

A.

Sequential Read: 70% at 8 KiB Sequential Write: 30% at 8 KiB

B.

Random Read: 70% at 8 KiB Random Write: 30% at 8 KiB

C.

Sequential Read: 80% at 8 KiB Sequential Write: 20% at 8 KiB

D.

Random Read: 50% at 32 KiB Random Write: 50% at 32 KiB

Buy Now
Questions 21

What is done during the preconfigure step of a PowerStore block import migration?

Options:

A.

Source system is added to the PowerStore.

B.

Destination volume is created.

C.

Network connectivity is set up.

D.

Import schedule is set.

Buy Now
Questions 22

What are the inputs and outputs of the Unity Designer tool?

Options:

A.

Inputs: Sales order, Sizing XML file, System configuration PDF file Outputs: Detailed design, Excel configuration guide report

B.

Inputs: Sales order, Excel configuration guide report, Detailed design Outputs: Sales order, Sizing XML file, System configuration PDF file

C.

Inputs: Sales order, Detailed design, Excel configuration guide report Outputs: Sizing XML file, System configuration PDF file

D.

Inputs: Sales order, Sizing XML file, System requirements Excel file Outputs: Detailed design, Excel configuration guide report, System configuration PDF file

Buy Now
Questions 23

A technical architect is helping a customer prepare for a data center maintenance window. All applications must failover to the disaster recovery site. The customer also wants to test their disaster recovery plan. What PowerStore Manager replication option should be used to address the customer's need, and from which site should the option be run?

Options:

A.

Planned failover from target site

B.

Planned failover from source site

C.

Failover from source site

D.

Failover from target site

Buy Now
Questions 24

What is the maximum RPO that can be configured on a Dell Unity XT block-asynchronous replication session?

Options:

A.

24 hours

B.

14 days

C.

7 days

D.

48 hours

Buy Now
Questions 25

Which backend port are required to expand the PowerStore x200 models to have NVMe Expansions?

Options:

A.

100 GbE 2-port Mezz card

B.

25 GbE 4-Port Mezz Card

C.

32 Gb FC I/O Module

Buy Now
Exam Code: D-MSS-DS-23
Exam Name: Dell Midrange Storage Solutions Design 2023
Last Update: Jul 1, 2025
Questions: 86
$66  $164.99
$50  $124.99
$42  $104.99
buy now D-MSS-DS-23