Easter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65percent

Welcome To DumpsPedia

CFM Sample Questions Answers

Questions 4

What is the relationship between position power and personal influence?

Options:

A.

Position power alone is sufficient for effective leadership

B.

Position power can create personal influence

C.

Personal influence cannot be attained without first having a position of power

D.

Personal influence and position power come from different sources

Buy Now
Questions 5

What activity would increase a facility's carbon footprint?

Options:

A.

Replacing filters in the air handlers

B.

Extending the occupancy hours

C.

Replacing the existing system with high-efficiency equipment

Buy Now
Questions 6

A company's data center is being relocated to a different building. Who should be hired to ensure that the new location is properly prepared when the equipment arrives?

Options:

A.

An HVAC consultant who has experience with renovations.

B.

The vendor who is providing the computer equipment.

C.

An electrical engineer who has experience in the industry.

D.

A consultant who has experience relocating data centers.

Buy Now
Questions 7

What is the most important factor to consider when upgrading the Building Management System (BMS)?

Options:

A.

The provider indicates the software version is obsolete

B.

Requirement to automate FM tasks

C.

An upgraded version is now available from the manufacturer

D.

Additional metrics are required for management reporting

Buy Now
Questions 8

There has been a recent increase in complaints of items stolen from people's desks within a facility. What is the facility manager's initial step regarding the security of the staff and facility?

Options:

A.

Install security cameras throughout the facility to ensure you capture future incidents.

B.

Update your security procedures to ensure that staff maintain a secure desk.

C.

Investigate each case and remind staff to ensure all valuables are locked.

D.

Turn the matter over to a professional security company to lead an investigation.

Buy Now
Questions 9

Which technology would be BEST to notify facility occupants during an emergency?

Options:

A.

Company's social media profile.

B.

Emergency notification system.

C.

E-mail system.

D.

Incident management system.

Buy Now
Questions 10

When are the laws of supply and demand relative to price?

Options:

A.

When demand exceeds supply, prices drop

B.

Price is the only factor that limits the supply

C.

When demand exceeds supply, prices rise

D.

If supply exceeds demand, prices rise

Buy Now
Questions 11

What is the purpose of a punch-list (defects list) walk-through in construction?

Options:

A.

To identify items that do not conform to contract documents that the contractor must complete prior to final payment

B.

To ensure that the construction site is free from debris

C.

To walk through the construction project with the contractor and discover what needs to be completed

Buy Now
Questions 12

What is typically NOT included in the evaluation process for investments in new equipment?

Options:

A.

NPV analysis

B.

Net Benefit analysis

C.

Root cause analysis

Buy Now
Questions 13

What, in addition to vision, incentives, action plan, and resources, is required for the change management process to be effective?

Options:

A.

Experience

B.

Support

C.

Directives

D.

Skills

Buy Now
Questions 14

What does NOT contribute to your company's overall carbon footprint?

Options:

A.

Amount of kWh consumed by your facility

B.

Amount of solar energy generated by your facility

C.

Amount of fossil fuels consumed by your facility

D.

Amount of stormwater runoff created by your facility

Buy Now
Questions 15

What advantages can you gain by capturing and applying lessons learned in a multi-phased project?

Options:

A.

Documenting lessons learned provides a way to pass on and usefully apply knowledge gained in one project to other projects. This saves time and money by preventing mistakes, streamlining work processes, and freeing staff to deal with unique aspects of later phases.

B.

Purchases made in earlier phases can be reused in later phases, saving money through efficient management of resources and negotiation of discounts with vendors as project managers learn to work with vendors.

C.

Since every phase is different, the only advantage of moving solutions forward is to know what has already been tried as learned from a previous situation.

D.

People learn what works and how to get along with their peers and leaders. As a result, teams can be organized so conflicts can be avoided since interpersonal relationships have already been tested.

Buy Now
Questions 16

Recently, an organization has flattened its structure versus that of a typical pyramid structure. As part of the restructure, the existing office building will be renovated. What type of design elements should a facility manager consider in the renovation?

Options:

A.

Offices for management, teaming areas, shorter workstation panels, and large conference rooms

B.

Team areas, bigger workstations for files, offices for senior management, and fewer meeting rooms

C.

Space for employee interaction, team areas, smaller workstations, and shorter panels

Buy Now
Questions 17

What is the definition of "real property"?

Options:

A.

Things located within buildings such as furniture, accessories, appliances, etc.

B.

Property that has nothing artificial on it, only natural materials.

C.

Land, buildings, and machinery or equipment.

D.

Inventory and loose materials.

Buy Now
Questions 18

What is considered the point in an asset’s life cycle where the total ownership costs are at the lowest?

Options:

A.

Ownership life

B.

Useful life

C.

End of life

D.

Economic life

Buy Now
Questions 19

During contractor evaluation, you discover their incident rate is below the industry average. What does this indicate?

Options:

A.

The contractor has a better reputation and focuses on customer satisfaction.

B.

The contractor has a robust financial balance sheet and is in good financial standing.

C.

The contractor has a safety program that focuses on reducing injuries and is followed in practice.

Buy Now
Questions 20

The finance director has asked the facility manager to prepare a financial analysis comparing two alternatives for roofing system replacements. Each option has a different first cost, annual maintenance, and expected useful life. Which capital investment analysis technique would best consider the time value of money in the comparison?

Options:

A.

Benchmarking

B.

Payback

C.

Net Present Value

Buy Now
Questions 21

A new hire has been provided with new uniforms and a $150 stipend to purchase new work boots. Within the first month of employment, the employee informs the manager that another job has been accepted and provides a two-week notice. What actions should the manager take regarding the material issuances?

Options:

A.

Ask in a thoughtful and respectful tone for the employee to reimburse the organization for the uniforms and work boots.

B.

Absorb the loss of the material in the operating budget under uniform depreciation.

C.

Refer to the employee handbook and follow organizational policy regarding uniform and work boot issuances.

Buy Now
Questions 22

A company's CFO has instituted a new accounting system, whereby part of the facility management funding is distributed to each department. The facility manager will assess each department for rent, utilities, and services. What is the billing of these expenses called?

Options:

A.

Departmental distribution

B.

Allocation budgeting

C.

Chargeback

D.

Distribution costing

Buy Now
Questions 23

How is the Facility Condition Index (FCI) determined?

Options:

A.

Dividing the cost of deficiencies by the facility replacement value.

B.

Subtracting the facility replacement value by the cost of deficiencies.

C.

Dividing the facility replacement value by the cost of deficiencies.

D.

Multiplying the cost of deficiencies by the facility replacement value.

Buy Now
Questions 24

How should rainwater from a hospital roof be used?

Options:

A.

Domestic, such as bathing.

B.

Dishwashing in the kitchen.

C.

Landscape maintenance.

D.

Medical process rinses.

Buy Now
Questions 25

You work for an organization that puts a strong emphasis on corporate values and being the employer of choice; truly valuing their people. The organization has put a lot of time and effort into ensuring that policies and procedures are in place to create an environment where employees are valued. This includes the company's performance appraisal system. How do you ensure the employees meet the expectations of the organization as well as your expectations?

Options:

A.

The organization will provide the format for performance reviews, including how often they occur. Set performance measures with employees and review with them according to the organization policy.

B.

Conduct an annual performance review as specified by HR. Have the employees develop a list of goals for themselves, taking into account the organization's objectives for next year.

C.

Develop performance measures and have the employees confirm their goals in writing and send monthly reports on progress towards their goals, including any issues they are facing.

D.

Set performance measures that are specific, measurable, and realistic. Tie these performance measures to department and organizational goals. Conduct monthly coaching sessions to review progress with the employees and provide coaching as needed to keep them on track.

Buy Now
Questions 26

Which is the MOST important best practice to ensure a successful safety culture?

Options:

A.

Go beyond statutory requirements.

B.

Lead by example.

C.

Utilize technology to streamline safety training and enforcement.

D.

Prioritize safety.

Buy Now
Questions 27

What is a reason to invest in real estate?

Options:

A.

Sales tax advantage.

B.

Capital appreciation.

C.

Irregular return.

D.

Capital depreciation.

Buy Now
Questions 28

Which standard would a facility manager use when assigning the floor area for occupant groups?

Options:

A.

Industry-specific standard

B.

Open Standards Consortium for Real Estate Standard

C.

Accessibility standard

D.

ASTM/IFMA standards

Buy Now
Questions 29

You have taken a position in a new country and do not speak the native language. However, your first task will be a facility renovation project. You need to become familiar with the standards, regulations, and laws that are applicable to a facility renovation project. What information source would be most accurate?

Options:

A.

The laws for the country’s national government

B.

The local authority having jurisdiction

C.

The owner's corporate legal department

D.

The organization that wrote each law, standard, and regulation

Buy Now
Questions 30

What is the MOST effective tool in managing change?

Options:

A.

Managing resistance.

B.

Anticipating user denial.

C.

Using surveys.

D.

Communication.

Buy Now
Questions 31

A facility manager may be responsible for status reviews on projects. Why are status reviews important and valuable?

Options:

A.

To identify reasons for variance from baseline and ensure responsible parties are identified

B.

To keep accurate records of all project tasks regardless of variation from baseline

C.

To identify issues and corrective actions to ensure the project remains on track

D.

To keep the project team aware of others’ progress on a project

Buy Now
Questions 32

What budgeting method requires a facility manager to use historical budget data?

Options:

A.

Activity-based budgeting

B.

Incremental budgeting

C.

Revenue-based budgeting

Buy Now
Questions 33

What is the BEST course of action for a facility manager to take when an engineer continues to lag behind other engineers in productivity?

Options:

A.

Use the engineer as an example of how not to perform to other engineers.

B.

Report the engineer to Human Resources.

C.

Develop a performance improvement plan with the engineer.

D.

Give the engineer a chance to correct his deficiencies on his own.

Buy Now
Questions 34

When developing a business continuity plan, the organization's leadership should establish a level of acceptable operations. What should be included in a plan to measure the expected level of success against the level of acceptable operations?

Options:

A.

Performance metrics

B.

Lessons learned

C.

Business case analysis

Buy Now
Questions 35

A residential complex next to a facility manager's building has complained about light trespassing from the campus area. What is the BEST action to take to minimize the amount of light that escapes from your property?

Options:

A.

Remove some of the lights closest to the residential complex.

B.

Reduce the fixture's height, angling, and shield the fixtures to decrease glare.

C.

Reduce the wattage in the exterior lighting fixtures.

D.

Move the offending light fixtures away from that area.

Buy Now
Questions 36

When managing quality, what are Key Performance Indicators (KPIs) based on?

Options:

A.

What stakeholders feel is important

B.

What the facility manager feels is important

C.

What the facility management team feels is important

D.

What the CEO feels is important

Buy Now
Questions 37

What approach should be taken to accommodate sustainability and customer concerns about installing flow restrictors?

Options:

A.

Take no action. The WPM is guided by company sustainability initiatives and this program needs to be implemented.

B.

Offer to place out the flow restrictors in a few designated restrooms to provide customer feedback on their performance. Agree to review and meet later with the WPM.

C.

Install the flow restrictors and remove them without informing the WPM.

D.

Refuse to install the flow restrictors.

Buy Now
Questions 38

When would an organization choose a lease with a purchase option?

Options:

A.

When tax rebates cannot be applied.

B.

When it lacks the initial capital for the purchase.

C.

When it has long-term plans to develop the real estate.

D.

When it needs to partner with a developer.

Buy Now
Questions 39

What purpose does project evaluation serve?

Options:

A.

To assess whether the project's objectives are being met

B.

To resolve claims and disputes in a timely manner

C.

To provide control of a project

D.

To track and monitor project progress

Buy Now
Questions 40

What is an effective way to engage your staff in generating ideas that support the organization’s goal?

Options:

A.

Consider only those ideas of select staff.

B.

Roll out to the organization those processes which you believe are effective.

C.

Obtain feedback from staff and implement those ideas with positive feedback.

D.

Develop an open-door policy and dialogue with staff on how the team may help the organization achieve its goals.

Buy Now
Questions 41

What is a facilities register?

Options:

A.

A list of accounts representing the contracted services for a facility.

B.

A comprehensive list of the organization’s facility assets, including buildings, grounds, and infrastructure.

C.

An integrated work management system utilized in a facility to track preventative and on-demand work orders.

D.

A master list of emergency contacts for use in business continuity/emergency purposes.

Buy Now
Questions 42

What is used to control lighting, HVAC, and other systems?

Options:

A.

Building Automation Systems (BAS)

B.

Geographical Information Systems (GIS)

C.

Computer-Aided Maintenance Management Systems (CMMS)

D.

Building Information Modelling (BIM)

Buy Now
Questions 43

An organization is considering relocating from leased building #1 into leased building #2. Leased building #1 is 55,000 sq. ft. costing $1,100,000 annually. Leased building #2 is 50,000 sq. ft. costing $1,100,000 annually. Building #1 can house 500 people and building #2 can house 580 people. The company's benchmark is $2,000.00 per person per year for leased space. What is the MOST important reason to know what the company's benchmarks are?

Options:

A.

It allows other organizations to measure against your results.

B.

It structures your recommendations in a method your managers require.

C.

It provides a quantitative measure to support your recommendations and decisions.

D.

It simplifies the budgeting process.

Buy Now
Questions 44

The facility manager has been asked to provide a listing of all properties owned and leased by the organization. In which system does the information typically reside?

Options:

A.

Building Information Modeling System.

B.

Computer Aided Facility Management System.

C.

Building Automation System.

D.

Computerized Maintenance Management System.

Buy Now
Questions 45

What is the first step in aligning the facility manager's strategy to the organization's strategy after assembling various inputs and producing the mission and vision statements?

Options:

A.

Perform a strengths, weaknesses, opportunities, threats (SWOT) analysis

B.

Define what constitutes success in the strategic planning process

C.

Produce vendor-client profiles or business goals

D.

Organize and compile comprehensive data to feed the organization's strategy

Buy Now
Questions 46

What defines the building envelope?

Options:

A.

Stairways and vertical penetrations.

B.

Exterior walls, roof, windows, and doors.

C.

Corridors and circulation spaces.

D.

Electrical and mechanical areas.

Buy Now
Questions 47

What is the fourth stage in a well-established model of team development that consists of forming, storming, and norming?

Options:

A.

Adjourning

B.

Completing

C.

Reporting

D.

Performing

Buy Now
Questions 48

Your company is evaluating a commercial office building for a new acquisition. What documents are the most important to review during the due diligence process?

Options:

A.

Current building as-built drawings

B.

Local building codes

C.

Current tenants' leases

Buy Now
Questions 49

Who implements the strategic facility plan?

Options:

A.

Operations Manager

B.

Facility Manager

C.

Chief Financial Officer

D.

Chief Operations Officer

Buy Now
Questions 50

A facility manager has developed a new health and safety program. What should be the next step?

Options:

A.

Post the program on the internal website for employees to read and take action.

B.

Put a notice on the bulletin board explaining the health and safety program.

C.

Send out an email announcing the new health and safety program.

D.

Develop a formal communication plan outlining the various tools used to communicate to the staff.

Buy Now
Questions 51

Many large corporations prefer to locate a site and build a plant to meet their exact specifications. Because they prefer to invest their capital in their own business operations rather than real estate, they seek an investor who will buy the property and build. The company then executes a long-term lease with the investor. What is the resulting agreement called?

Options:

A.

Gross lease agreement

B.

Special-purpose agreement

C.

Non-competing tenant agreement

Buy Now
Questions 52

What is churn in a building?

Options:

A.

The term used for frequency of occupancy moves in a facility

B.

The flow of fresh air through the office

C.

The method of deciding who occupies a given space or cubicle

Buy Now
Questions 53

What best describes Performance Measures?

Options:

A.

Performance indicators including metrics and drivers that achieve a given outcome.

B.

Pre-determined set of performance indicators and the actual results.

C.

Parameters and metrics that evaluate objectives against actual performance and goals.

Buy Now
Questions 54

A landlord has just completed a major capital improvement in a multi-tenant commercial building. The property manager is responsible for determining if the costs of the project can be recovered from the tenants. What is NOT part of the process?

Options:

A.

Checking each lease to determine if capital costs are recoverable

B.

Splitting costs evenly and charging all costs in the year when the project was performed

C.

Determining how much should be recovered each year and for how many years

D.

Determining if a finance charge gets added to the recoverable costs

Buy Now
Questions 55

When during a major design project is the best time to provide your changes to the design team?

Options:

A.

During the Construction Documents phase when the designers are finalizing the drawing and the specifications.

B.

During the Schematic or Design Development phase when the documents are still fluid and changing.

C.

During the early stages of Construction Phase when the contractor has had time to review the design documents.

Buy Now
Questions 56

A company has decided to establish a long-range strategic facility technology plan. What is the first step in determining the future technology needs of the company?

Options:

A.

Determine the level of employee technological skill requirements for the future.

B.

Review corporate plans for building renovations and lease negotiations.

C.

Research advances in technology.

D.

Conduct an assessment of existing technology.

Buy Now
Questions 57

What term reflects a governance function?

Options:

A.

Guide

B.

Execute

C.

Plan

Buy Now
Questions 58

What should be considered when developing a strategic facility management plan?

Options:

A.

The demand organization’s business plan.

B.

Reducing facility management cost.

C.

Obtaining a larger facility management budget.

Buy Now
Questions 59

What may be impacted if requirements aren't captured correctly at the beginning of an Integrated Workplace Management System (IWMS) implementation?

Options:

A.

Cost and schedule

B.

Temperature control and cost

C.

Special relations and utilizing color

Buy Now
Questions 60

What is the purpose of a punch-list (defects list) walk-through in construction?

Options:

A.

To identify items that do not conform to contract documents that the contractor must complete prior to final payment

B.

To ensure that the construction site is free from debris

C.

To walk through the construction project with the contractor and discover what needs to be completed

Buy Now
Questions 61

What is an example of adaptive change?

Options:

A.

Vendors launching a new product division

B.

New policy for working from home

C.

Employee seeks college education

D.

Construction of a new head office

Buy Now
Questions 62

What is the PRIMARY purpose of the Incident Command System (ICS)?

Options:

A.

Respond to large incidents.

B.

Avoid duplication of efforts in any incident.

C.

Effectively respond to any incident.

D.

Meet the needs of large operational staff.

Buy Now
Questions 63

As the Facility Manager, you secured 5,500 square feet of Class A office space on a multi-tenant floor to support a two-year business initiative. To minimize capital investment, the space will be used with pre-existing furnishings, fixtures, and equipment. However, before you can move people into this space, you will need a certificate of occupancy. What system must be examined to obtain a certificate of occupancy?

Options:

A.

Life safety system

B.

Potable water system

C.

Network connections

D.

Telephone system

Buy Now
Questions 64

What functionality enables a Building Automation System (BAS) to support energy management during peak demand periods?

Options:

A.

Thermal coupling

B.

Capacity management

C.

Load shedding

D.

Cycle management

Buy Now
Questions 65

When delegating tasks, what should a supervisor know about each employee?

Options:

A.

Work style.

B.

Strengths.

C.

Accomplishments.

D.

Preferences.

Buy Now
Questions 66

What does a Cost Plus to a Guaranteed Maximum Price (GMP) contract signify?

Options:

A.

The Contractor is selected based on final drawings and his own costs and the individual subcontractors' costs. No cost increases are allowed beyond the GMP.

B.

The Contractor is selected based on GMP price of the final drawings and can charge the project based on all invoices produced plus its Fee & General Conditions costs.

C.

The Contractor is selected early in the project based on its Fee and its General Conditions costs and provides a GMP once drawings are more developed.

Buy Now
Questions 67

What are the three Rs of sustainability?

Options:

A.

Reduce, remove, and replace

B.

Reduce, reuse, and repurpose

C.

Reduce, reuse, and recycle

Buy Now
Questions 68

You manage a design-build project to renovate a new office space, including infrastructure upgrades. At the 60% design phase, the design-build contractor’s project estimate is over budget and contingency. What should be done first to address the issue?

Options:

A.

Investigate delaying a portion of the project until additional funding is available.

B.

Pursue a change order from the project sponsor for the difference.

C.

Remove the infrastructure upgrade items from the project scope.

D.

Investigate the reasons for being over budget.

Buy Now
Questions 69

How should the facility manager ensure the gym meets staff expectations?

Options:

A.

Solicit staff asking for suggestions on how to improve the gym.

B.

Poll in the industry and ask them how best to create and maintain a gym facility for staff use.

C.

Have the facility manager perform the monthly inspections.

D.

Hire a consultant to provide you with information regarding trends to keep a gym current.

Buy Now
Questions 70

What measures could you have taken to ensure your staff member focused on measurable priorities that you had established?

Options:

A.

You should have made it clear when hiring your Project Coordinator that it was his responsibility to ensure his projects were completed in a quality manner.

B.

The Project Coordinator should have set up regular appointments with you to demonstrate how he was completing his tasks according to the performance measures that he established.

C.

You should have hired a very experienced Project Coordinator to ensure that your priorities were met.

D.

You should have met with your Project Coordinator regularly to prioritize work, review assigned projects, and report on performance.

Buy Now
Questions 71

Part of your goals is to develop a succession plan for key positions within your operation, including yourself. What is most helpful in reaching this goal?

Options:

A.

Conduct staff interviews to see who wants to be promoted.

B.

Conduct a review of staff goals and objectives.

C.

Conduct a skills gap analysis of current staff and incorporate the results into training goals.

Buy Now
Questions 72

What is the definition of physical vacancy?

Options:

A.

Percentage of units that are unoccupied and available for lease

B.

Spaces occupied but in delinquencies

C.

Percentage of units that are occupied but are not producing income

D.

Leasable space that is used for other purposes or is otherwise impossible to lease

Buy Now
Questions 73

What is the first step to successful outsourcing?

Options:

A.

Negotiating terms.

B.

Planning the initiatives.

C.

Selecting providers.

D.

Analyzing cost/performance.

Buy Now
Questions 74

You are looking for ways to bring a project plan in on budget and on time. The project is still in the planning phase. At this time, the project's staffing is set up to be contracted for everything except project management. You think that human resources might be a constraint that you could change to re-balance the project’s budget. Where would you look for human resources that would help bring down the project budget?

Options:

A.

Use students and volunteer labor. Since these individuals work without payment, they will extend your workforce and accomplish the work under close supervision of skilled staff.

B.

Plan to have 24x7 shifts. This will decrease the time length of the project, which will cut the staffing requirements.

C.

Ask contractors to cut their staffing model to match your budget. Contractors tend to over-budget staff as a way to build in contingency.

D.

Use in-house staff that either have the desired skills or are seeking to develop skills and experiences. This may mean negotiating trade-offs with other projects or departments.

Buy Now
Questions 75

Your senior leadership decided to implement an energy dashboard to track utility consumption. They want a baseline before commissioning has started to evaluate the results. How should this commissioning information be used on the dashboard?

Options:

A.

To show the month's utility usage after commissioning and guide decisions on installing additional equipment.

B.

To show how much energy comes from the grid and how much from renewable sources.

C.

To show changes in energy usage as commissioning projects are completed and determine whether the project achieved the desired outcomes.

D.

To show monthly kilowatts used by individual pieces of equipment.

Buy Now
Questions 76

What steps should be taken to create a risk assessment and risk plan?

Options:

A.

Identify the risks. Determine the probability and severity of each risk. Develop contingency plans to ameliorate each risk.

B.

Communicate the risks to stakeholders. Request additional funds to cover contingencies on the most important risks.

C.

Add additional days to activity durations to build in a cushion. Identify areas in the project that can be cut out, if necessary.

D.

Utilize project tools. PERT or Gantt charts, work breakdown structures to identify risk, track issues, and mitigation risks.

Buy Now
Questions 77

What are intentional, accidental, or natural disasters called?

Options:

A.

Situations.

B.

Threats.

C.

Casualties.

D.

Warnings.

Buy Now
Exam Code: CFM
Exam Name: Certified Facility Manager
Last Update: Apr 20, 2025
Questions: 251
$57.75  $164.99
$43.75  $124.99
$36.75  $104.99
buy now CFM